Insulated Metal Panel (IMP) Installation Services
At Terrapin Construction Group (TCG), insulated metal panel installation is one of our signature strengths. With over one million square feet of IMPs installed in 38 states coast to coast, we’ve delivered high-performance environments for clients in nearly every industry. Whether you’re building a cold storage warehouse, a pharmaceutical cleanroom, CEA Facility, or a large-scale production plant, we help you build smarter, faster, and stronger.
Why Owners and Developers Choose IMPs
Insulated Metal Panels (IMPs) outperform conventional wall systems by delivering superior energy savings, durability, and compliance.
Thermal Performance – Up to R-8.5 per inch, reducing long-term HVAC costs.
Regulatory Compliance – Seamless, non-porous surfaces that meet FDA, USDA, and cGMP standards.
Durability – Rigid steel skins and foam cores resist corrosion, impacts, and moisture.
Speed of Construction – Prefabricated modular panels reduce schedule and labor costs.
Our Nationwide IMP Installation Process
TCG has refined a repeatable, scalable process for IMP delivery that ensures quality across diverse projects:
Project Discovery – Define goals for energy, sanitation, and regulatory performance.
Engineering & Selection – Source the right panels for your needs from leading national manufacturers.
Pre-Construction Integration – Align structural tolerances, attachments, and sequencing.
Precision Installation – Union-trained teams deliver airtight, compliant installations.
Performance Validation – Final inspections confirm that panels meet project and regulatory requirements.
Case Study Highlights
Southeast Cold Storage Facility – 87,000 SF
In 2025, we delivered a 90,000 square foot cold storage warehouse in the Southeast, helping the client recover three weeks on the project schedule through expert sequencing and panel installation.
Midwest Food Processing Plant – 120,000 SF
In 2025, at a 120,000 square foot food production facility in the Midwest, our IMP installation enabled the client to achieve USDA and FDA certification on first inspection, while also reducing construction costs compared to conventional multi-trade wall assemblies.
Northeast Pharmaceutical Cleanroom – 65,000 SF
In 2024, for a major pharmaceutical client in the Northeast, we installed 65,000 square feet of cleanroom IMPs designed to meet cGMP and ISO cleanroom standards. Our team coordinated closely with mechanical and process trades to ensure zero schedule conflicts.
West Coast Manufacturing Facility – 114,000 SF
In 2024, at a 150,000 square foot manufacturing expansion on the West Coast, our team’s efficient IMP installation helped the owner achieve substantial energy savings through reduced HVAC loads, supporting long-term operational efficiency.
Craftsmanship Backed by Scale
With over a million square feet installed, Terrapin Construction Group brings both scale and precision. Our union-trained installers understand the critical details that make the difference between panels that look good on day one and panels that perform flawlessly for decades.
Architectural IMP Installation – Design with Impact
Our architectural insulated metal panels deliver both aesthetics and performance:
Clean, modern lines that elevate your brand.
Integrated finish options that reduce additional cladding costs.
Consistent thermal performance without compromising appearance.
Commercial & Industrial IMP Installation – Built for Demanding Environments
For food processing, brewing, pet food, Controlled Environment Agriculture (CEA) and general manufacturing, our IMP systems provide:
Up to 30% faster installation than conventional wall systems.
Structural and fire resistance with FM-approved assemblies.
Sanitary performance that withstands frequent washdowns and meets regulatory standards.
Preferred IMP Installer Nationwide
TCG is the preferred nationwide IMP Installer for leading insulated metal panel manufacturers including Arch Solar, Permatherm, and UPI. Our professional crews are trusted by manufacturers and clients alike.
Cold Storage & Controlled Environment IMP Solutions
In highly regulated or temperature-sensitive environments, performance matters most. Our panels deliver:
Consistent Cold Storage – Stable internal temps down to -40°F.
Vapor-Tight Construction – Prevents condensation and ice buildup.
Rugged Durability – Designed for heavy traffic and continuous operations.
Nationwide Industry Expertise
TCG has completed IMP projects in nearly every sector:
Automotive Manufacturing
Cleanrooms & Pharmaceuticals
Power & Chemical Facilities
Food Processing & General Manufacturing
Bulk Handling & CEA Agriculture
From Florida to California, New England to the Pacific Northwest, our team has proven experience delivering IMP solutions that meet the highest standards of compliance and performance.
Let’s Talk About Your Insulated Metal Panel Install
With 1,000,000+ square feet of IMPs installed in 38 states, Terrapin Construction Group is the national partner you can trust to deliver performance, compliance, and speed. Whether your next project is a cold storage warehouse, a regulated cleanroom, or a large-scale production facility, TCG has the expertise to bring it to life.