Big-Firm Capabilities. Small-Team Attention. Nationwide Commercial General Contractor & Design-Build Firm • Licensed in All 50 States
Terrapin Construction Group is a nationwide commercial general contractor and design-build firm delivering precision, professionalism, and national reach without the overhead. Licensed and active in all 50 states, from concept through closeout.
Who Is Terrapin Construction Group?
Terrapin Construction Group is a nationwide commercial general contractor, design-build firm, and owner's representative, licensed and actively building in all 50 states across 14 commercial verticals. Headquartered in Denver, Colorado, TCG self-performs insulated metal panel installation, with more than 1 million square feet installed across 38 states, erects pre-engineered metal buildings, and delivers architecture, structural engineering, MEP engineering, preconstruction, and construction under a single contract. Typical project size runs $1M to $30M.
Built on a Simple Insight
The TCG leadership team spent years managing complex, high-stakes commercial construction projects, many exceeding $100 million, for some of the largest firms in the industry. Across all of those projects, one pattern emerged: the actual execution always came down to a handful of highly capable people.
Despite sprawling teams and multi-layered processes, lean groups of skilled professionals consistently outperformed bloated organizations on speed, quality, and cost-efficiency. That insight became the foundation of Terrapin Construction Group.
We launched TCG with a clear mission: to bring the precision, professionalism, and national reach of a large firm without the overhead. Since then, we have delivered design-build commercial construction across all 50 states, consistently meeting aggressive timelines and strict budgets. Our agile, expert-driven approach gives clients big-firm capabilities with small-team attention.
At Terrapin, we are not just building structures. We are building trust, efficiency, and lasting partnerships across the country. We work with NAIOP-affiliated developers, BOMA-managed property owners, commercial real estate brokers, and the institutional capital partners shaping commercial real estate in 2026. For owners who want that experience on their side of the table without handing us the construction contract, TCG also serves as an independent owner's representative.
See Terrapin Construction Group in Action
Design. Build. Deliver. In all 50 states. Terrapin Construction Group is a nationwide commercial general contractor and design-build partner for restaurants, data centers, cultivation facilities, cold storage, and large-scale industrial projects.
- Fogo de Chão, Phoenix, AZ: construction management for a full-service Brazilian steakhouse
- 300,000 SF data center campus, north of Dallas, TX: three 100,000 SF clear-span PEMBs, Building 1 steel to sign-off in 41 days
- 50,000 SF cannabis cultivation, Minneapolis, MN: insulated metal panel supply and install
What Makes Us Different
Three things separate TCG from the typical regional commercial GC: nationwide licensure under one accountable partner, self-performed specialty scopes, and integrated design-build delivery under a single contract. The six pillars below are how that plays out on a project.
National Reach, Local Expertise
We have built enduring relationships with subcontractors, suppliers, and consultants in every state. For each project, we assemble the right regional team, matched to local codes, labor markets, and delivery dynamics, while providing national-caliber oversight from our Denver headquarters. Vetted subcontractor networks in over 50 metros mean an established local bench in the market where your project is actually being built.
Design-Phase Discipline
Our team is structured to support the early-phase services that matter most. From cost modeling and feasibility studies to constructability reviews and value engineering, we align design decisions with real cost data and buildable sequences, so what is drawn on paper translates to what is built in the field.
Transparent Partnership
Clear budgets, real-time reporting, and proactive problem-solving at every stage. We view ourselves as an extension of our client's team, advocating for their goals from concept through closeout. Challenges are surfaced early and solutions shared openly. Owners who want that oversight without a construction contract can engage us as an owner's representative instead.
Technical Precision Across Sectors
From medical facilities and biotech labs to cannabis cultivation and data centers, we bring the specialized knowledge technically demanding projects require, balancing regulatory compliance, systems integration, and mission-critical deadlines.
Self-Performing Specialties
TCG self-performs insulated metal panel installation, pre-engineered metal building erection, and equipment procurement and installation. Controlling these scopes in-house means we directly influence cost, schedule, and quality on the work most likely to drive the critical path.
Integrated Delivery
Architecture, structural engineering, MEP engineering, preconstruction, and construction management under one contract. Smoother transitions between design and build, fewer change orders, and a facility ready to perform from day one.
Selected Project References
A representative sampling across TCG's six anchor verticals. For the complete portfolio, visit the projects page.
Four recent builds across four delivery models. Photos and full details are on the projects page.
Delivered 30 Days Early
Data Centers · PEMB
300,000 SF Data Center Support Campus
North of Dallas, TX · PEMB Erection & Insulation
Three 100,000 SF pre-engineered metal buildings erected and insulated for a new data center’s staging campus. Building 1 went from steel to sign-off in 41 days.
View spotlight
Design-Build
Healthcare · Optometry
Advantage Eye Care
Owensboro, KY · 6,000 SF Design-Build TI
A full optometry practice delivered single-source, from shell to patient-ready: exam lanes, pre-testing, optical dispensary, procedure room, and custom millwork.
View spotlight
Construction Management
Restaurant · Fine Dining
Fogo de Chão Phoenix
Phoenix, AZ · Full-Service Brazilian Steakhouse
Construction management for a full-service Fogo de Chão, coordinating the churrasco grill line, bar, dining room, and commercial kitchen through opening.
View spotlight
IMP Supply & Install
Cannabis · IMP · Flooring
Indoor Cannabis Cultivation Facility
Minneapolis, MN · 50,000 SF IMP
50,000 SF of insulated metal panel with doors and hardware supplied and installed, plus urethane cement flooring supply and install.
View spotlight
- 87,000 SF Industrial Cold Storage, Southeast (Design-Build)
- 150,000 SF Manufacturing Expansion, West Coast
- 120,000 SF Food Production Facility, Midwest
- PepsiCo Light Industrial, Blue Ridge VA and Tolleson AZ
- NREL Research Facility, Golden CO (55,000 SF)
- Indoor Cannabis Cultivation Facility, Minneapolis MN 50,000 SF IMP Supply & Install · Urethane Cement Flooring · 2026 Watch the install
- Vireo Health, Elk River MN (116,000 SF CEA)
- AYR Wellness, Cleveland OH (60,000 SF)
- Southern Sky, Canton MS (60,000 SF)
- Agronomia Canna, Mexico City MX Agricultural Infrastructure Consulting · 500,000 SF
- Active in 20+ regulated cannabis markets nationally
- DaVita Dialysis, 25 locations across Texas (75,000 SF)
- Multi-Specialty Animal Hospital, Houston TX
- Multi-Site Urgent Care Rollout, Southwest
- Bellaire Dental, Houston TX
- Vision Source, Sugar Land TX (12,000 SF)
- Fogo de Chão, Phoenix AZ Construction Management · 2026
- Hotel ZaZa, Austin TX (24,000 SF)
- InterContinental Hotel, San Francisco CA (564,614 SF)
- PF Chang's, Denver CO
- Perry's Steakhouse, The Woodlands TX
- Del Frisco's Grille, The Woodlands TX
- Enterprise Data Center, Denver Metro
- Edge Data Centers, Multiple Markets
- Colocation Shell & Core, Southeast (45,000 SF)
- Disaster Recovery Site, Midwest (12,000 SF)
- See data center capabilities
- 15,000 SF Class A Office TI, Denver CO
- Warehouse to Brewery Conversion, Denver
- Big-Box Retail to Self Storage, Multiple
- Historic Office to Mixed-Use, Northeast
- Multi-Location Restaurant Rollout, Southwest
Selected references include projects delivered by Terrapin Construction Group and projects delivered by TCG leadership prior to forming the firm. Project-specific roles, delivery methods, and references are available on request.
TCG Leadership Team
The TCG leadership team is three partners: Will Goodin, Ben Merritt, and Nathan Stabler. TCG was founded by three construction professionals who saw an opportunity to deliver better outcomes through a leaner, more accountable model. Together with the broader TCG team, they bring more than 100 years of combined experience across commercial, industrial, healthcare, and agricultural construction, holding PMP, LEED AP, CAPM, and ICC Certified National Standard General Building Contractor credentials.
William C. Goodin
Will leads TCG's early-phase project strategy, guiding opportunities from concept through contract execution. He oversees client engagement, preconstruction coordination, and design-phase management to ensure every project is aligned with cost, schedule, and performance goals. With over 25 years of experience and his ICC Certified National Standard General Building Contractor (Class B) certification, Will integrates construction management with operational strategy. Prior to TCG, Will served as VP of the Project Management Office at Urban-Gro, Inc. (NASDAQ: UGRO) and founded multiple firms including REI Capital, BWI Capital, Rubix Group, FlexMOD, and GroAdvisor, completing hundreds of design-build projects across the USA and abroad.
Ben Merritt
Ben brings more than 18 years of operational and leadership experience to TCG, providing both strategic oversight and practical, day-to-day guidance that keeps the firm running with precision and efficiency. He excels at developing scalable systems, optimizing resource allocation, and implementing best practices that enhance performance across all projects. Ben's proactive leadership style and commitment to continuous improvement allow him to identify challenges early, drive swift resolution, and uphold rigorous standards of quality, safety, and timeliness. He also oversees contract administration, bonding and insurance, and equipment procurement, the operational backbone of TCG's mission of excellence and reliability.
Nathan Stabler
Nathan is a founding member of TCG and serves as Vice President of Construction Services, bringing more than 16 years of construction industry experience with meticulous attention to detail, technical depth, and a highly engaged management style. He provides executive oversight across all active projects, leveraging broad knowledge of delivery methods and construction management best practices. Nathan works with design teams, owners, and trade partners to ensure each project is constructible, efficient, and aligned with schedule and budget. His early involvement in every engagement, from preconstruction through closeout, lets his team anticipate challenges and maintain momentum. He also leads field operations on TCG's self-performed IMP installation work.
Working with TCG was one of the best decisions I have made for my business. From day one, they provided an unmatched level of guidance and expertise. The budgeting and scheduling process was refreshingly straightforward. They walked me through the reasoning, the options, and the potential impacts. Our multiphase commercial development was completed on schedule and under budget. I never felt like just a client. I truly felt like a partner.
Dano Keys, Bravo Zulu Properties
Terrapin Construction's Network
Terrapin Construction's network is a curated group of architecture, engineering, manufacturing, and specialty trade partners: Graphia Architecture, GEM Studio Architecture, and 3rd Act Architecture for design, 9BA for MEP engineering, Toro Steel Buildings for pre-engineered metal buildings, and PermaTherm Panels for insulated metal panels. These are firms we have worked alongside on dozens of projects and trust to deliver at TCG's quality standard. Together, this ecosystem gives clients integrated delivery without the overhead of a large in-house design department.
Graphia Architecture
TCG's go-to architecture partner on design-build projects. Graphia carries projects from concept and schematic design through construction documents for industrial, PEMB, cannabis, and commercial work, with TCG pricing the design as it develops so the drawings stay inside the budget.
GEM Studio Architecture
A national commercial architecture and interior design firm based in Greenwood Village, Colorado. GEM Studio brings 20+ years of hospitality, restaurant and bar, retail, office, industrial, and cannabis design, licensure in 22 states, and in-house permitting leadership. See hotel, restaurant and QSR construction.
3rd Act Architecture
Our long-standing architectural design partner. 3rd Act brings cultivation facility expertise, technical building design, and delivery-focused practice to TCG projects nationwide. See architectural design-build services.
9BA MEP Engineering
Our integrated partner for mechanical, electrical, plumbing, and process design. 9BA engineers every system for the building's mission, from cold storage refrigeration to data center power density. See MEP engineering.
Toro Steel Buildings
Factory-direct pre-engineered steel building systems from Toro, a manufacturer with 40+ years in the industry. TCG has erected Toro structures on 24+ PEMB projects across the United States, pairing project-specific engineered steel with TCG's self-performed erection crews. See pre-engineered metal buildings.
PermaTherm Panels
A core manufacturer in TCG's IMP supply-and-install program. PermaTherm panels go into TCG cold storage, food processing, and cannabis cultivation envelopes, with TCG handling takeoff, procurement, and installation under one scope. Price a scope with the IMP install estimator.
Direct Manufacturer Network
Direct supply relationships with Kingspan, Metl-Span, CENTRIA, AWIP, PermaTherm, FALK, UPI Panels, MBCI, and Arch Solar, the manufacturer ecosystem powering TCG's million-plus square feet of IMP installations.
Reality Capture Atlanta
Through our partnership with Reality Capture Atlanta, TCG provides millimeter-accurate point cloud building scans, scan-to-BIM modeling, and as-built documentation, accelerating condition assessment, repositioning analysis, and adaptive reuse projects.
Cannafloors
A 10-year polyaspartic specialty flooring partnership focused on cannabis cultivation, food processing, and high-performance commercial environments where moisture mitigation and chemical resistance matter.
FlexRock Roofing Partnership
Our commercial roofing capability is anchored by a manufacturer partnership with FlexRock, extending TCG's envelope expertise from wall systems through roof assembly on every commercial project.
Services & Expertise
TCG provides full-spectrum commercial construction services from initial feasibility through final turnover. Every service below is a distinct engagement, and clients regularly start with one and expand into others as a project develops.
Sectors We Build
Fourteen commercial verticals, each with direct project experience and an active subcontractor bench. Every sector page is written for owners and their advisors, and is built to be forwarded.
Three free tools support every engagement: the TCG.ai cost estimator, the permit timeline estimator, and the construction loan qualifier. Already holding a contractor's proposal? Send it through the free bid review.
Markets We Build In
TCG is licensed and actively building in all 50 states, with a Denver headquarters and vetted subcontractor networks in over 50 metros. Our Denver headquarters carries senior staff, estimating, and project management. Vetted local subcontractor networks put an established bench in each market, so projects are run by people who know the jurisdiction rather than managed remotely. Below are the metros with dedicated market pages.
The TCG Intelligence Library
Beyond construction services, TCG publishes one of the most comprehensive commercial construction intelligence libraries in the industry: long-form cost guides, delivery method comparisons, code and regulatory explainers, and vertical-specific resources covering every major commercial building type. Free to access and built to be forwarded to clients.
Whether you are sourcing benchmarks for a pro forma, evaluating delivery methods, or briefing your board, the library is built to be useful before any conversation with TCG ever happens.
Frequently Asked Questions About Terrapin Construction Group
Twenty-seven questions about who TCG is, what we do, and how we work. For sector-specific questions, visit the complete FAQ page.
Terrapin Construction Group (TCG) is a nationwide commercial general contractor, design-build firm, and owner's representative licensed and active in all 50 states. Headquartered in Denver, CO, TCG serves clients nationwide, delivering integrated design, engineering, and construction services across 14 commercial verticals, from cold storage and cannabis to healthcare, data centers, and adaptive reuse.
TCG is headquartered in Denver, Colorado and serves clients in all 50 states. Our Denver headquarters carries senior staff, estimating, and project management. Vetted local subcontractor networks put an established bench in each market, so projects are run by people who know the jurisdiction rather than managed remotely. See markets we build in.
TCG is licensed and active in all 50 US states. Headquartered in Denver, Colorado, with vetted subcontractor networks in over 50 metros. The firm combines national reach with established regional subcontractor and supplier networks in each market served. See markets we build in.
The TCG leadership team is three partners. Will Goodin, VP of Project Development, holds PMP, LEED AP, and ICC Certified National Standard General Building Contractor Class B credentials with over 25 years of design-build experience. Ben Merritt, VP of Business Operations, holds CAPM with over 18 years of operational leadership. Nathan Stabler, VP of Construction Services and a founding member, holds LEED AP with over 16 years of construction experience. Together with the broader TCG team, they bring more than 100 years of combined experience.
Yes. TCG is licensed in all 50 states and carries commercial general liability, workers compensation, and project-specific coverage as required. Certificates of insurance, bonding capacity letters, and state license documentation are provided as part of any qualification package or lender submission. TCG is also a Procore Certified Contractor.
Three things. Nationwide licensure in all 50 states with one accountable partner rather than a patchwork of regional GCs. Self-performed specialty scopes including over 1 million square feet of insulated metal panel installation, plus PEMB erection and equipment procurement. And integrated design-build delivery under one contract. The lean structure means the partner answering the call is the partner running the project.
TCG offers full-spectrum commercial construction services including design-build delivery, general contracting, construction management, owner's representation, preconstruction, architectural design, structural engineering, MEP engineering, IMP installation, pre-engineered metal building erection, equipment procurement, commercial flooring, and commercial roofing.
TCG builds across 14 commercial sectors: warehouses and cold storage, hotels, restaurants and QSR, healthcare and medical office buildings, cannabis facilities, CEA and vertical farms, industrial manufacturing, biotech labs, veterinary clinics, self storage, urgent care, grocery and retail, data centers, tenant improvement and buildouts, and adaptive reuse and conversions.
Yes. TCG self-performs insulated metal panel installation with over 1 million square feet installed across 38 states, pre-engineered metal building erection, and equipment procurement and installation. Self-performing these scopes gives TCG direct control over cost, schedule, and quality rather than relying on a subcontractor tier for the most schedule-critical work.
Insulated metal panels are prefabricated wall and roof assemblies with a foam core bonded between two metal skins, delivering structure, insulation, vapor barrier, and finish in one product. Installation is a specialty because joint detailing, thermal bridging, and vapor control determine whether a temperature-controlled building actually performs. Poor installation shows up as condensation, ice buildup, and elevated refrigeration load years after occupancy, which is why cold storage and food processing owners weight installer experience heavily. See the IMP manufacturer comparison.
Yes, for insulated metal panel installation. TCG performs IMP supply-and-install as a specialty trade contractor for other general contractors on cold storage, food processing, cannabis, data center, and cleanroom projects nationwide, drawing on direct manufacturer relationships with Kingspan, Metl-Span, CENTRIA, AWIP, PermaTherm, FALK, UPI Panels, MBCI, and Arch Solar. Price a scope with the IMP install estimator.
Yes. Owner's representative and construction management engagements are available for owners who want independent oversight without handing TCG the construction contract. This is a common structure when a client already has a contractor selected but wants experienced representation reviewing budgets, schedules, change orders, and draw requests on their side of the table.
Design-build is a project delivery method combining design and construction under one contract, providing single-point accountability and eliminating the adversarial dynamic between designer and builder common in design-bid-build. Research published by the Design-Build Institute of America and Penn State has found design-build projects deliver faster and with less cost growth than design-bid-build. TCG integrates architecture, structural engineering, MEP engineering, and construction under one team.
TCG works under design-build, construction management, hard bid, guaranteed maximum price, and cost-plus arrangements. Delivery method selection depends on how much design is complete, how much cost certainty the owner needs at commitment, and who is best positioned to carry scope risk. TCG advises on that tradeoff during preconstruction rather than defaulting to one structure.
No. TCG provides architectural design through its architecture partners, including 3rd Act Architecture, Graphia Architecture, and GEM Studio Architecture, plus structural engineering and MEP engineering through our partnership with 9BA MEP Engineering. If you already have completed plans, TCG can bid or build from existing documents as a general contractor instead.
Yes. TCG's preconstruction team coordinates permit submittals, manages plan check responses, and engages permit expediters in high-volume jurisdictions, with permitting managed in 38 states across all five US permitting tiers. Entitlement work involving variances, conditional use permits, or rezoning is coordinated with land use counsel and the design team, since those approvals precede the building permit rather than running in parallel. Size your timeline with the free permit timeline estimator.
For a typical ground-up commercial project, plan on design and preconstruction of 3 to 6 months, permitting of 3 weeks to 18 months depending on jurisdiction, and construction of 6 to 18 months depending on size and complexity. Permitting is the widest variable and the most commonly underestimated. See the permit timeline estimator and material lead times.
Yes. TCG maintains surety relationships supporting payment and performance bonds on qualifying commercial projects. Bonding capacity and specific bond costs vary by project size, scope, and delivery method, and are confirmed with the surety during preconstruction. Bond premium is typically carried as a hard cost line item in the budget. See surety bonding for commercial GCs.
The fastest route is the free TCG.ai construction estimator, which returns preliminary cost benchmarks across every commercial building type. For envelope-heavy industrial work, the IMP Install Estimator prices supply-and-install scopes in real time. For projects past the LOI stage, TCG's preconstruction team delivers a hard-priced preliminary budget within 5 business days at no cost. Schedule a consultation to discuss your project.
TCG handles commercial construction projects ranging from roughly $1 million to $30 million in typical contract value, scaling case by case through subcontractor coordination on larger work. Project footprints range from tenant improvements under 5,000 SF to industrial and agricultural facilities exceeding 500,000 SF. See the project portfolio.
Pricing is built from current subcontractor data, material costs, and regional labor rates rather than solely from historical projects in that market. Where TCG has no established local subcontractor relationships, that is disclosed up front and the estimate carries a wider range until local pricing is solicited. TCG is licensed in all 50 states and states plainly when a market requires additional legwork to price with confidence.
TCG is a general contractor, not a lender or mortgage broker, and does not originate financing. What TCG does provide is the construction documentation lenders require before issuing a term sheet: a sourced budget, a signed GC contract, a schedule of values, and a project schedule. TCG also publishes a free construction loan qualifier that sizes a loan by LTC, LTV, and DSCR.
The Intelligence Library is TCG's published collection of commercial construction cost guides, delivery method comparisons, code and regulatory explainers, and vertical-specific resources covering every major commercial building type. It is free to access and built to be useful for owners, brokers, and developers before any conversation with TCG takes place. Start with the cost library or browse all articles.
Yes. TCG operates a dedicated broker partnership program for commercial real estate brokers nationwide, including free preliminary construction estimates, property condition assessment support, point cloud building scans through partner Reality Capture Atlanta, value engineering exercises, and a documented referral incentive program for closed deals. The partnership operates under a written no-conflict commitment.
Yes. TCG operates referral programs for commercial real estate brokers through the broker partnership page, and general project referrals through the referrals page. Closed projects originating from a documented referral trigger an incentive payment under a written agreement.
Terrapin Construction's network includes 3rd Act Architecture, Graphia Architecture, and GEM Studio Architecture for architectural design, 9BA MEP Engineering for mechanical, electrical, plumbing, and process design, Toro Steel Buildings for pre-engineered metal building systems, PermaTherm Panels and a direct IMP manufacturer network for envelope systems, Reality Capture Atlanta for point cloud scanning and scan-to-BIM, Cannafloors for polyaspartic specialty flooring, and FlexRock for commercial roofing systems.
Start with a 30-minute call or run the free estimator to get a preliminary number. From there TCG scopes what the project actually needs: a budget for underwriting, a feasibility review, a design-build proposal, or a competitive bid on existing documents. There is no cost for the initial conversation, preliminary estimating, or a bid review on an existing contractor proposal.
How We Qualify
Every claim on this page is backed by a credential, a license, or a project record available on request. Below is what TCG holds and the standards the firm works to.
All 50 States
Licensed as a commercial general contractor in all 50 states. State license numbers and certificates of good standing are provided in qualification packages and lender submissions.
PMP, LEED AP, CAPM, ICC
Partner credentials include Project Management Professional (PMI), LEED Accredited Professional (USGBC), CAPM, and ICC Certified National Standard General Building Contractor Class B (ICC).
Procore Certified Contractor
TCG runs projects on Procore for document control, RFIs, submittals, and draw documentation, giving owners and lenders a consistent record across every project regardless of market.
AIA & ConsensusDocs
TCG contracts on AIA and ConsensusDocs standard forms, with schedules of values structured to CSI divisions so owners, lenders, and construction monitors read the same document.
IBC, IECC, NFPA
Work is delivered to the adopted building, energy, and fire codes of each jurisdiction. Code adoption cycles vary by state, which is why preconstruction confirms the governing edition before design proceeds.
Owner's Representative
TCG serves as an independent owner's representative on projects where another contractor holds the construction contract, reviewing budgets, schedules, change orders, draw requests, and closeout on the owner's behalf. Also available as construction management.
Design-Build Practice
Design-build engagements follow DBIA best practices for teaming, procurement, and contracting, with a single point of accountability from concept through certificate of occupancy.
Page last reviewed . Company information, credentials, partners, and project references are reviewed quarterly. Questions about qualifications or references? Contact TCG.
Your Vision, Our Expertise. Together We Build.
Whether you need a competitive bid, design-build support, or just guidance on where to start, we would like to talk. Free preliminary estimates. National coverage. No pressure.

