High-Performance Epoxy Flooring Installation Services

At Terrapin Construction Group (TCG), nationwide epoxy flooring installation is a cornerstone of our industrial surfacing capabilities. With extensive experience delivering high-performance resinous flooring across 38 states, we provide owners and developers with durable, seamless, and low-maintenance surfacing solutions. Whether you’re outfitting a warehouse, manufacturing facility, distribution hub, or pharmaceutical lab, our epoxy expertise ensures your facility is protected and professional.

Why Owners and Developers Choose Epoxy Flooring

Industrial epoxy systems offer distinct advantages over unfinished concrete or traditional tiling by combining chemical resistance, safety, and longevity:

  • Superior Durability – High-build epoxy coatings protect concrete substrates from heavy vehicle traffic, impact, and abrasive wear.

  • Chemical & Moisture Resistance – Seamless barriers prevent oils, chemicals, and moisture from penetrating the slab, ensuring long-term structural integrity.

  • Enhanced Safety – Integrated slip-resistant textures and high-visibility safety striping reduce workplace accidents and improve navigation.

  • Low Maintenance – The non-porous, seamless surface eliminates grout lines and dust, making it easy to sanitize and clean.

  • Light Reflectivity – High-gloss finishes increase ambient light levels, improving visibility and reducing energy costs in large facilities.

Our Nationwide Epoxy Installation Process

TCG has refined a repeatable, scalable flooring delivery process that ensures consistent quality across diverse industrial environments:

  1. Site Assessment – Evaluate substrate condition, moisture vapor transmission (MVT) levels, and specific operational requirements.

  2. Mechanical Surface Prep – Utilize diamond grinding or shot blasting to achieve the proper Concrete Surface Profile (CSP) for maximum mechanical bond.

  3. System Specification – Selection of primers, base coats, and topcoats tailored to the facility's temperature, chemical exposure, and load requirements.

  4. Precision Application – Our trained crews apply resinous systems with exacting standards, ensuring uniform thickness and a flawless, seamless finish.

  5. Quality Validation – Final inspections confirm proper curing, adhesion strength, and compliance with safety and aesthetic specifications.

Case Study Highlights

  • Midwest Logistics Hub – 150,000 SF Installed a high-traffic, light-reflective epoxy system for a major logistics provider, improving facility brightness by 30% and enhancing forklift safety.

  • Southwest Food Processing Plant – 90,000 SF Applied a thermal-shock resistant urethane cement system with integrated cove bases to meet strict USDA hygienic standards for year-round production.

  • Southeast Aerospace Expansion – 120,000 SF Coordinated the installation of an Electrostatic Dissipative (ESD) flooring system, ensuring sensitive electronics manufacturing remained protected during phased construction.

Commercial & Industrial Epoxy Systems

  • Commercial & Decorative Epoxy – Combines aesthetic appeal with durability, utilizing metallic pigments or vinyl flakes for retail, showroom, and lobby environments.

  • Industrial & Heavy-Duty Coatings – High-performance systems engineered for extreme environments like chemical processing, heavy manufacturing, and cold storage.

Preferred Nationwide Flooring Partner

TCG partners with industry-leading resinous material manufacturers, ensuring that every project benefits from advanced polymer chemistry, comprehensive warranties, and reliable supply chains. Our reputation as a trusted specialty contractor makes us the go-to epoxy flooring partner for owners and developers nationwide.

Industries We Serve

  • Warehousing & Distribution

  • Manufacturing & Industrial Plants

  • Pharmaceutical & Life Sciences

  • Food & Beverage Processing

  • Aviation & Automotive Facilities

Let’s Talk About Your Upcoming Flooring Project

With successful epoxy flooring projects delivered nationwide, Terrapin Construction Group is the contractor you can trust to provide scale, efficiency, and performance. Whether you need a high-gloss warehouse floor, a chemical-resistant production area, or a turnkey industrial renovation, TCG has the expertise to bring your vision to life.