Seattle Medical Office and Healthcare Construction
TCG builds medical office buildings, clinics, imaging suites, and surgery centers across Puget Sound, delivered design-build with the code, infection-control, and MEP rigor healthcare demands.
Seattle Medical Office Cost Estimator
Describe your healthcare project and get a preliminary cost estimate calibrated to Seattle medical construction.
Tell Us About Your Seattle Project
Include building type, size, location in Puget Sound, special requirements, and timeline. Our AI applies Seattle prevailing wage, seismic, and permitting factors automatically.
Analyzing Your Seattle Project
Our AI is evaluating construction costs using Puget Sound market data.
Your Seattle Construction Cost Estimate
Seattle Medical Office and Healthcare General Contractor
Seattle's major health systems, UW Medicine, Swedish, Providence, and a large network of specialty practices, drive steady demand for outpatient and ambulatory construction across Puget Sound. Healthcare construction is exacting: infection control during construction, medical gas, imaging shielding, dedicated HVAC, and code compliance all have to be right, and the work often happens in occupied buildings.
TCG delivers design-build medical office and healthcare construction with in-house architecture, MEP engineering, and structural engineering. We build medical office buildings, clinics, imaging suites, and ambulatory surgery centers, and install the infection-control flooring healthcare requires. See our national healthcare practice.
How Much Does Medical Office Construction Cost in Seattle?
Seattle healthcare construction carries a premium over standard commercial work because of medical systems, code, and infection control, layered on the region's prevailing wage and seismic costs. Imaging and surgical space are the most expensive due to shielding, structure, and mechanical demands.
| Project Type | Seattle Cost Range |
|---|---|
| Medical office TI | $230-$400/SF |
| Ground-up medical office building | $300-$480/SF |
| Imaging suite (X-ray/CT/MRI) | $360-$580/SF |
| Ambulatory surgery center | $400-$650/SF |
| Urgent care clinic | $290-$520/SF |
Imaging shielding, medical gas, dedicated HVAC, and infection-control requirements are the main cost drivers. Use our AI estimator above or schedule a call.
Why TCG for Seattle Healthcare
Healthcare construction is a code and MEP discipline, and TCG keeps that engineering in-house. Our MEP team designs the medical gas, dedicated HVAC, and pressure relationships that clinical space requires, and our architects handle the code path, infection-control planning, and accessibility that healthcare demands.
Much of this work happens in occupied medical buildings, where dust, noise, and infection-control during construction are non-negotiable. Under one design-build contract, we plan that sequencing up front, design for Seismic Design Category D, and install the seamless, infection-control flooring clinical environments need.
Advantage Eye Care, Owensboro, KY
TCG delivered a 5,500 SF design-build tenant improvement for a full optometry practice in Owensboro, Kentucky, taking the space from shell to patient-ready under one contract, with architectural design, MEP coordination, and construction handled by one team.



Clinical tenant improvements live or die on coordination: exam lanes built to sight-line and lighting-control requirements, a pre-testing suite, an optical dispensary with fitting stations, and a minor procedure room, all finished to a retail-grade patient experience with custom millwork throughout.
TCG brings the same single-source design-build team to medical office, clinic, and healthcare tenant improvement projects in Seattle.
- Delivery: design-build tenant improvement
- Clinical: exam lanes, pre-testing suite, minor procedure room
- Retail: optical dispensary and patient lounge
- Finish: custom millwork and casework throughout
See all recent work on the TCG projects page.
Seattle Medical Office Construction FAQ
Common questions about medical office and healthcare construction in the Puget Sound region. See our full FAQ page for more.
TCG recently completed Advantage Eye Care in Owensboro, Kentucky, a 5,500 SF design-build tenant improvement for a full optometry practice with exam lanes, a pre-testing suite, an optical dispensary, a minor procedure room, and custom millwork, delivered from shell to patient-ready under one contract. TCG brings the same design-build team to medical and healthcare projects in Seattle.
Seattle medical office runs $230-$400/SF for a TI, $300-$480/SF for a ground-up MOB, $360-$580/SF for imaging suites, and $400-$650/SF for an ambulatory surgery center. Medical systems and shielding drive the cost.
Major systems like UW Medicine, Swedish, and Providence, plus a large network of specialty practices, drive steady demand for outpatient and ambulatory construction across Puget Sound.
Imaging suites require lead or specialty shielding, reinforced structure for heavy equipment, dedicated HVAC, and precise mechanical and electrical infrastructure. These requirements push imaging space to the high end of healthcare construction cost.
Yes. TCG plans infection-control, dust containment, and noise management for work in occupied medical facilities, sequencing the project to protect ongoing clinical operations.
Yes. TCG provides in-house architecture, MEP engineering, and structural engineering, which is essential for the medical gas, HVAC, shielding, and code compliance healthcare requires.
Yes. Healthcare facilities in Seattle must meet Seismic Design Category D, with heightened requirements for equipment anchorage and continued operation. TCG's structural engineers design for seismic performance on every project.
Explore More TCG Seattle Construction
TCG delivers every commercial sector across Puget Sound under one integrated design-build contract.
Let's Build Your Seattle Healthcare Facility
From Bellevue medical office TIs to ambulatory surgery centers, TCG is your design-build healthcare partner. Start with the AI estimator.
Schedule a Seattle Consultation
