Investors and Development Partners

Build Wealth From the Ground Up. Invest With Cost Certainty.

Terrapin Construction Group brings investors, family offices and co-GP partners into design-build development projects before capital is committed, with real cost data, one contract and one point of accountability from design through delivery. Current opportunities: an 8-story apartment building at the Sacramento Railyards and a 160-site RV resort near Lake Camanche in California's Gold Country.

Licensed in all 50 states Design-build single contract GMP delivery Updated October 2026
0
States licensed
0
States built in
0
Projects delivered
0
Project value
The short answer

How Does the TCG Investor Program Work?

TCG lists pre-development projects where the sponsor is seeking equity, co-GP or debt partners. We price every scheme in-house, so investors see a construction budget built from the cost of work, not a dollar-per-square-foot guess. Detailed cost models and pro formas are shared with qualified parties under NDA.

Who it's for

Accredited investors, family offices, developers seeking co-GPs, lenders and CRE brokers.

What's listed

Multifamily, mixed-use, outdoor hospitality and commercial projects in schematic design or entitlement.

What you get

ROM cost by option or phase, pro forma, risk register and a design-build schedule, under NDA.

Next step

Book a 30-minute call or request the investor package below.

Current opportunities

Two Pre-Development Projects Seeking Capital Partners

Each project is priced in-house by TCG, so the budget behind the pro forma comes from the cost of work. Select a project to see the program, the site and the investment case.

Rendering of the proposed 8-story mixed-use apartment building at 707 E Street, Sacramento
Opportunity 01 · Multifamily

707 E Street, Sacramento, CA

  • 90 to 120 apartments
  • 8 stories over podium
  • ~106,600 SF gross area
  • Railyards district
View 707 E Street
Rendering of the proposed clubhouse for the 160-site Camanche Parkway RV resort in Wallace, California
Opportunity 02 · Outdoor hospitality

Camanche Parkway RV Resort, Wallace, CA

  • 160 RV sites
  • 20 rental cabins
  • ~115 acres of land
  • Lake Camanche area
View the RV Resort
Interactive

Explore the Four Design Schemes

The sponsor is testing how many levels of structured parking to build and whether to add an 8th floor restaurant. Select a scheme to see how the building stacks up.

Concrete podium Apartments Restaurant Retail and lobby

Scheme 1.1: Three-level podium

100Apartments
20 / 25 / 552BR / 1BR / Studio
5Residential levels
3Concrete podium levels
40Parking stalls
No8th floor restaurant
47,825Rentable apartment SF
45%Apartment efficiency

Every scheme includes ground floor retail, two stair and elevator cores and a rooftop amenity deck. Cost and return figures for each scheme are in the investor package.

Why this location

The Railyards Are Doubling the Size of Downtown Sacramento

The site sits on the 7th Street corridor between downtown and the Railyards, a 240-acre former rail yard now anchored by a stadium, a hospital campus and California's second busiest rail station.

March 2025

Kaiser breaks ground

The Kaiser Permanente Railyards Medical Center starts construction: an 18-acre, 310-bed campus.

2025 to 2026

Station opens to the Railyards

The city advances a new north entrance at Sacramento Valley Station, linking the platforms to the Railyards.

March 2026

Stadium upsized to 20,000+ seats

Republic Stadium at The Railyards commits to full build-out as a soccer-first venue. CapRadio.

2028

Republic Stadium opens (target)

Home of Sacramento Republic FC plus concerts and international matches.

2029

Kaiser campus opens (target)

About 3,000 health care jobs, with planned Valley Rail service adding commuter links to Stockton and the Bay Area.

Opportunity 02 · Outdoor hospitality

11176 Camanche Parkway South, Wallace: A 160-Site RV Resort Near Lake Camanche

Entitlement · Seeking capital partners

A planned RV and cabin resort on about 115 acres of rolling oak woodland in Wallace, California, in Calaveras County, a short drive from Camanche Reservoir. The program pairs 160 RV sites and 20 rental cabins with a clubhouse and pool, trails and an equestrian center, on a site that already has wells, a fire water system and a commercial driveway.

Rendering of the proposed single-story clubhouse with stone chimney and covered entry for the Camanche Parkway RV resort in Wallace, California
Clubhouse, front corner
160RV sites
20Rental cabins
~115 AcresTwo parcels, zoned A1
64Full hookup, 50-amp sites
3,500 to 4,000 SFClubhouse with pool
Up to 100K SFEquestrian center
45Boat and horse trailer stalls
2 WellsPlus fire water tank

RV site mix

160 pull-in sites with four service levels, so the rate card can cover full-time travelers and weekend campers.

Full hookup: 50A, water, sewer64
Partial: 50A and water32
Partial: 30A and water32
Electric only: 30A32

Cabins and amenities

Each cabin includes parking and a private outdoor deck. The two largest add a kitchenette and bathroom.

280 SF cabins14
392 SF cabins4
648 SF cabins, kitchenette and bath2
Pool and putting greenGeneral storeLaundryBusiness centerBathhousesPickleball and basketballPicnic and BBQ areasHiking and horse trailsIndoor and outdoor arenasRV dump station

Why TCG fits this build

The program is mostly site work, utilities and small repeatable buildings, plus an indoor arena and maintenance shop that suit a pre-engineered metal building. TCG prices and delivers all of it under one design-build contract, so phasing decisions are made against real cost.

Conceptual design drawings prepared for county pre-application and conditional use permit review, subject to change. Renderings courtesy of the project architect.

Why this location

Lake Camanche Already Draws Campers. RV Hookups Nearby Are Limited.

Camanche Reservoir sits on the Mokelumne River where Gold Country meets the Central Valley, within day-trip range of Sacramento, Stockton, Lodi and the Bay Area.

12 square miles of water

Camanche Reservoir covers about 12 square miles with roughly 53 miles of shoreline, used for fishing, boating, swimming and camping.

About 200 RV hookups

The reservoir's own campgrounds offer more than 500 campsites but only about 200 RV hookups, all at South Shore, according to the operator.

An equestrian audience

The reservoir already hosts an equestrian group campground and riding trails, which is why the plan includes trailer parking, arenas and horse trails.

52 million households

More than 52 million North American households camped in 2025, and glamping made up 29% of all camping experiences, per the KOA camping and outdoor hospitality report.

~19 miLodi
~25 miStockton
~41 miSacramento
~86 miSan Francisco

Straight-line distances from the site. Drive times are longer.

How it works

Cost Certainty Before Capital Is Committed

Most development deals fail on cost, not demand. TCG prices the building before investors commit, then holds the number through design-build delivery.

01

Price every scheme

In-house preconstruction prices each massing option to the cost of work, so the pro forma rests on real numbers.

02

Lock a GMP

One design-build contract and a guaranteed maximum price, with architecture, engineering and construction under one roof.

03

Deliver in the open

Open-book pay applications and draw schedules lenders and investors can audit.

Why this protects your capital

Construction contingency is a project fund, not contractor profit. Any unused balance at closeout returns 100% to the owner. Compare delivery methods in our guide to design-build vs CM at risk vs design-bid-build.

Under NDA

What's in the Investor Package

ROM

Cost by scheme or phase

Itemized rough order of magnitude cost for each design scheme or build phase, from cost of work through markups.

NOI

Stabilized pro forma

Rent roll or rate card, operating expenses, valuation and yield on cost, with every assumption shown.

Δ

Tradeoffs

What each option adds or removes from cost and income: parking levels and the restaurant at 707 E Street, phasing and amenity mix at the RV resort.

!

Risk register

Entitlement, code, site and utility risks with the step that retires each one.

GMP

Path to a GMP

Design-build schedule and procurement plan from concept design to guaranteed price.

1:1

Partner call

Thirty minutes with a TCG partner to walk the numbers and answer questions.

Who we partner with

Built for Capital Partners at Every Level

Accredited investors

Direct exposure to ground-up projects with transparent construction cost behind the numbers.

Family offices

Larger equity checks and long-hold strategies near major public and private investment.

Developers seeking co-GPs

Bring your site; TCG brings design, pricing and delivery. See our GC services.

Construction lenders

Budgets built to the cost of work and draw reporting your loan team can verify.

CRE brokers

Introduce a buyer or capital partner through our broker partner program.

Owners weighing a deal

Independent cost checks through bid review and the TCG.ai instant estimator.

Request the package

Request an Investor Package

Tell us about you and we'll send the NDA, then the full cost model and pro forma. Prefer to talk first? Book a 30-minute call.

Investor FAQ

Investor Questions

707 E Street, Sacramento

What is the 707 E Street Sacramento development?

It is a proposed 8-story mixed-use apartment building at 707-709 E Street in Sacramento, California, with 90 to 120 studio, one-bedroom and two-bedroom apartments over a concrete podium with ground floor retail and structured parking. It is in pre-development and the sponsor is seeking capital partners.

Where is the site relative to the Sacramento Railyards?

The site is at the corner of 7th and E Streets on the north edge of downtown Sacramento, along the 7th Street corridor into the Railyards, where Republic Stadium and the Kaiser Permanente Railyards Medical Center are under construction.

What design schemes are being studied?

Four schemes test two questions: whether to build two or three levels of concrete podium, which trades parking stalls for apartments, and whether to include an 8th floor restaurant. Apartment counts range from 90 to 120 and parking from 22 to 40 stalls.

What is the project timeline?

The project is in schematic design. Timing to construction depends on entitlement, financing and the final scheme. TCG's design-build approach lets design, permitting and procurement overlap to shorten the schedule.

Camanche Parkway RV resort

What is the Camanche Parkway RV resort opportunity?

It is a planned RV and cabin resort at 11176 Camanche Parkway South in Wallace, California, with 160 RV sites, 20 rental cabins, a clubhouse with pool, bathhouses, trails and an equestrian center on about 115 acres. It is in the county entitlement stage and the sponsor is seeking capital partners.

Where is the RV resort site?

The site is in Wallace, in Calaveras County, California, near Camanche Reservoir on the Mokelumne River. In a straight line it is about 19 miles from Lodi, 25 miles from Stockton, 41 miles from Sacramento and 86 miles from San Francisco.

What will the RV resort include?

The plan includes 64 full hookup sites with 50-amp power, water and sewer, 96 partial hookup sites, 20 cabins from 280 to 648 SF, a 3,500 to 4,000 SF clubhouse with pool, store and laundry, bathhouses, pickleball and basketball courts, picnic areas, hiking and horse trails, 45 boat and horse trailer stalls and an equestrian center of up to 100,000 SF.

What is the entitlement status of the RV resort?

The site is zoned A1, and the RV park requires a conditional use permit from the county. Conceptual site plans, cabin, bathhouse and clubhouse designs have been prepared for pre-application and conditional use permit review. Timing to construction depends on the county approval, financing and the final phasing plan.

What existing infrastructure does the RV resort site have?

The site already has two wells, a fire water storage tank with a pump house that feeds three hydrants, a commercial driveway apron on Camanche Parkway South, a secondary emergency exit, a pond and an existing concrete slab that will be reused for the sport courts.

Why include cabins in an RV resort?

Cabins let the resort serve guests who do not own or tow an RV, which widens the market beyond RV owners. Glamping made up 29% of all camping experiences in 2025, and 31% of new campers chose glamping accommodations, according to the KOA camping and outdoor hospitality report.

Investing

How can I review the cost estimate and pro forma?

Request the investor package for either project or book a call on this page. Qualified parties receive the cost model, pro forma and risk register after signing a non-disclosure agreement.

Does TCG offer securities or take investor money?

No. TCG is a contractor, not a broker-dealer or fund. Any investment is offered only by the project sponsor through its own offering documents, typically to accredited investors. Nothing on this page is an offer to sell or a solicitation to buy securities.

Who can invest?

Eligibility is set by the project sponsor's offering documents. Most private real estate offerings of this type are limited to accredited investors.

Working with TCG

What is Terrapin Construction Group's role?

TCG is the design-build general contractor. TCG prices the project schemes, manages design and preconstruction, delivers a guaranteed maximum price and builds the project under a single contract.

What happens to unused construction contingency?

Construction contingency is a project fund for unforeseen conditions. Any unused balance at closeout returns 100% to the owner.

Can TCG evaluate a development deal I am already looking at?

Yes. TCG prepares independent cost reviews and feasibility pricing for developers and investors nationwide, including bid reviews and early-stage budgets from the TCG.ai instant estimator.

Related reading: multifamily wood-frame cost per unit, cost per square foot by building type, construction-to-permanent loan conversion, site development cost per acre, metal building cost per square foot and the TCG cost library.

About this page: project details reflect each sponsor's design as of October 2026 and are updated as the project advances. This page is for informational purposes only and does not constitute an offer to sell or a solicitation of an offer to buy any security. Any offering will be made only by the project sponsor through definitive offering documents. Program, renderings, schedule and figures are preliminary and subject to change.