Dallas Commercial General Contractor & Design-Build
Terrapin Construction Group designs and builds commercial projects across the Dallas-Fort Worth metroplex: cold storage, data centers, medical, restaurants, cannabis and hemp processing, warehouse, self-storage, industrial, hospitality, retail, and tenant improvements, all under one design-build contract with self-performed IMP and flooring.
Dallas Commercial Construction Cost Estimator
Describe your project and get a preliminary cost estimate calibrated to Dallas-Fort Worth metroplex market pricing.
Tell Us About Your Dallas Project
Include project type, size, location in the metroplex, intended use, and timeline. Our AI applies Texas and DFW cost indices automatically.
Analyzing Your Dallas Project
Our AI is evaluating construction costs using DFW metroplex market data…
Your Dallas Commercial Construction Estimate
One Design-Build Partner. Every Sector. Coast to Coast.
Dallas-Fort Worth is one of the largest and most durable commercial construction markets in the country. No state income tax, right-to-work labor, DFW airport, BNSF intermodal, Toyota North America in Plano, State Farm in Richardson, American Airlines in Fort Worth, UT Southwestern Medical Center, the largest data center market in Texas, and population growth that does not quit make DFW a different problem than the smaller Texas metros. TCG is built for that scale.
TCG actively builds across the DFW metroplex and brings national cannabis facility experience (a decade and over 1,000,000 SF of IMP installed across 38 states) to Texas operators preparing for expanded program capacity and to current hemp processors. We design and build cold storage, data centers, medical, restaurants, cannabis and hemp processing, warehouse, self-storage, industrial, hospitality, retail, and tenant improvements across the metroplex under a single design-build contract. IMP installation (over 1,000,000 SF nationally) and specialty flooring are self-performed; architecture, MEP, and structural engineering are in-house.
Texas is right-to-work and DFW is moderate cost (multiplier roughly 0.92 to 1.05x of national average). We coordinate City of Dallas Development Services, Dallas County, and the surrounding municipalities (Plano, Frisco, Irving, Arlington, Fort Worth) plus ERCOT/Oncor utility service capacity and TDLR licensing from preconstruction so the schedule does not break against approvals or power. DFW hail and severe-weather exposure also drive envelope and roof detailing differently than other Texas metros.
Five DFW Sector Deep Dives
Dallas Cold Storage Construction
Refrigerated, frozen, blast freeze, and USDA-compliant builds with self-performed IMP envelopes engineered for DFW summer-dominant vapor drive, hail exposure, and DFW airport + I-35 distribution corridor logistics.
View the cold storage guide →Dallas Data Center Construction
Enterprise, Tier III/IV, AI-HPC, and colocation builds in the largest Texas data center market. ERCOT and Oncor utility coordination, hail-resistant envelope, and DFW data center alley experience built into preconstruction.
View the data center guide →Dallas Medical Construction
MOBs, ASCs, urgent care, imaging suites, and medical TI. Texas does not require Certificate of Need so schedules move faster; UT Southwestern, Baylor, and Texas Health adjacency are designed in from preconstruction.
View the medical guide →Dallas Restaurant Construction
QSR drive-thru, fast casual, full-service, fine dining, BBQ pits, brewery and distillery hospitality, plus restaurant tenant improvements with Dallas Health Department coordination across the metroplex.
View the restaurant guide →Dallas Cannabis Construction
Texas Compassionate Use Program cultivation and processing, hemp and CBD processing facilities, and dispensary buildouts with self-performed IMP envelopes, cultivation HVAC, and specialty flooring. National cannabis experience applied to Texas.
View the cannabis guide →300,000 SF Data Center Support Campus, North of Dallas
TCG erected and insulated three 100,000 SF pre-engineered metal buildings for the staging and storage campus of a new data center north of Dallas, Texas. Building 1 went from start of steel erection to sign-off in 41 days, and the full campus finished 30 days ahead of schedule.





Support buildings have to be ready before the main data hall can move, so every day saved here is a day saved on the critical path. Crews ran early morning and night shifts under light towers to beat the Texas heat, with roof panels, wall cladding, and insulation moving in parallel instead of in sequence.
It is the kind of schedule-first delivery the DFW data center market runs on. More on Dallas data center construction, pre-engineered metal buildings, and the PEMB cost guide.
- Scope: PEMB steel erection, roof and wall panels, and insulation
- Use: staging and equipment storage for a new data center campus
- Schedule: parallel roof, wall, and insulation crews on extended shifts
- Result: 300,000 SF delivered 30 days early
Full photo gallery on the project spotlight.
0:50
41 Days From Steel to Sign-Off
The 50-second cut of this campus, from first steel to sign-off on Building 1, plus recent TCG work in Phoenix and Minneapolis.
Selected Texas Projects
TCG holds a Texas presence in Dallas, TX and has delivered across the state, from a 300,000 SF data center support campus north of Dallas and DFW cold storage and IMP envelopes to multi-site healthcare and restaurant rollouts. National experience spans 38 states and over 1,000,000 SF of self-performed IMP. TCG also builds in Houston, Austin, and San Antonio.
Data Center Support Campus, North of Dallas
Three 100,000 SF pre-engineered metal buildings erected and insulated for a new data center staging campus. Completed fall 2026, 30 days ahead of schedule.
Cold Storage & IMP Envelopes, DFW
Refrigerated and freezer cold storage across the metroplex with self-performed IMP envelopes. Over 1,000,000 SF of IMP installed across 38 states, detailed for DFW summer-dominant vapor drive, hail exposure, and the DFW airport and I-35 distribution corridor.
Restaurants & Steakhouses
Del Frisco's Grille (The Woodlands), 3 Forks Steakhouse (2 locations), and Perry's Steakhouse (The Woodlands). Ground-up and tenant-improvement restaurant delivery with health-department coordination.
Hospitality
Hotel ZaZa (Austin sister property) and hospitality builds, including high-finish guest-facing scope on compressed schedules.
Healthcare, 25-Site Texas Rollout
DaVita Dialysis, 25 sites across Texas. Standardized multi-site medical delivery with repeatable prototypes and TDLR-compliant buildouts.
Automotive & Industrial
Auto Nation Dallas (35,000 SF) plus industrial projects across Texas, including PEMB and IMP-clad facilities.
Owner's Representative Services in Dallas
When an owner already has a general contractor but needs builder-grade oversight, TCG serves as the owner's independent advocate from site selection through closeout. We handle owner's representative scope across all 50 states: GC selection and bid normalization, contract and buyout review, pay application and change-order review, schedule and budget controls, quality and envelope oversight, and closeout. On DFW projects that lean on cold storage, IMP envelopes, or power-dense systems, a rep who has actually self-performed that scope protects the owner's critical path and budget.
Owner's rep pairs naturally with TCG bid review and preconstruction services. TCG also builds in Houston, Austin, and San Antonio.
What Does Commercial Construction Cost in Dallas?
DFW multiplier is roughly 0.92 to 1.05x of national average. Texas right-to-work labor pricing helps, and DFW labor market is deeper and more cost-stable than Austin. Use the estimator above for a project-specific range, or browse national cost benchmarks.
Refine your number with the Dallas estimator and the IMP estimator, or schedule a 30-minute call for a partner-led conceptual budget.
Dallas Commercial Construction FAQ
Common questions about commercial construction in DFW and the broader metroplex. See the full TCG FAQ for more.
Dallas metro construction runs from about $45 to $105 per SF for tilt-up warehouse, $145 to $335 for office, $178 to $460 for medical, $180 to $460 for restaurant, $118 to $305 for cold storage, $180 to $620 for hospitality, and $305 to $1,230 for data center. Multiplier is roughly 0.92 to 1.05x of national average. Use the cost estimator above and the national cost guide.
TCG builds the full commercial mix across DFW: cold storage and food processing, data centers, medical office buildings and ASCs, restaurants and QSR, cannabis and hemp processing, warehouse, self-storage, industrial and manufacturing, life sciences, hospitality, grocery anchored retail, tenant improvements, and adaptive reuse. IMP installation is a core self-perform.
Population growth, no state income tax, right-to-work labor, DFW airport (one of the busiest in the world), BNSF intermodal at Alliance, Toyota North America HQ in Plano, State Farm HQ in Richardson, American Airlines HQ in Fort Worth, and the largest data center market in Texas. Cold storage, medical, distribution, and corporate relocation demand are all durable.
Texas runs an isolated grid (ERCOT). For power-dense facilities (data centers, cold storage, cultivation, manufacturing) we coordinate the serving utility (Oncor across most of DFW) and the ERCOT interconnection process early. Transformer lead times run 40 to 80 weeks. DFW carries the heaviest data center concentration in Texas, which makes utility queue management consequential.
No. Texas repealed Certificate of Need decades ago and does not require it for hospitals, ASCs, MOBs, or imaging in most cases. UT Southwestern, Baylor Scott & White, Texas Health Resources, and the strong freestanding ER market all expand faster than they could in a CON state. TDLR licensing and local permitting still apply. See our Dallas medical construction guide.
Texas operates a limited medical program (the Compassionate Use Program, CUP) for low-THC cannabis, with a small set of licensed dispensing organizations. Hemp and CBD processing are legal under the Texas Hemp Farm Act (2019). TCG actively builds across the DFW metroplex and brings national cannabis facility experience (a decade and over 1,000,000 SF of IMP installed across 38 states) to Texas operators preparing for expanded program capacity and to current hemp processors. See Dallas cannabis construction.
Typical durations: tilt-up warehouse 7 to 11 months, restaurant ground-up 7 to 11 months, medical office 10 to 16 months, cold storage 11 to 18 months, data center 14 to 24 months, tenant improvement 3 to 7 months. Design-build overlaps design, permitting, and procurement to compress schedule 15 to 30 percent. City of Dallas Development Services permitting (or Plano, Frisco, Irving, Arlington, Fort Worth depending on site) is the long pole on most projects.
DFW runs zone 8a: hot humid summers (June through September), mild winters with occasional hard-freeze events (Feb 2021 reinforced freeze-tolerant MEP design), severe weather with significant hail and tornado exposure (inland market, not coastal). Vapor drive is summer-dominant (inward) so cold storage envelopes and grow rooms need tight vapor sealing and dehumidification sized for the latent load. Hail-resistant roofing and IMP detailing matter more in DFW than in most Texas metros.
Design-build puts architecture, engineering, and construction under one contract. For DFW it compresses schedule 15 to 30 percent against design-bid-build, locks pricing earlier, and removes the GC-versus-design finger-pointing that kills budgets. TCG self-performs IMP and specialty flooring, and engineers MEP in-house.
TCG self-performs insulated metal panel installation (over 1,000,000 SF across 38 states) and specialty commercial flooring. We engineer architecture, MEP, and structural in-house, and we GC and CM all other scopes through a vetted DFW subcontractor network. Self-perform on the envelope and flooring protects the critical path.
TCG holds a Texas presence in Dallas, TX, builds actively across the metroplex, and most recently erected and insulated a 300,000 SF data center support campus north of Dallas (three 100,000 SF pre-engineered metal buildings), finished 30 days ahead of schedule in fall 2026. TCG has also delivered automotive (Auto Nation Dallas 35,000 SF), restaurant (Del Frisco's Grille Woodlands, 3 Forks Steakhouse 2 locations, Perry's Steakhouse Woodlands), hospitality (Hotel ZaZa Austin sister property), healthcare (Davita Dialysis 25 sites across Texas), and industrial projects across the state. National experience includes 38 states and over 1,000,000 SF of IMP.
Sweet spot is $1M to $30M per project. We build smaller (tenant improvement, single restaurant, single dental office) and larger (cold storage 100,000+ SF, data center, multi-site rollouts) on a case basis. Single-source design-build delivery is what we do best in that range.
Yes. Owner's representative services are available across all 50 states. TCG acts as the owner's independent advocate from site selection through closeout: GC selection, bid normalization, pay application review, schedule and budget controls, and closeout. Useful when an owner already has a GC but needs builder-grade oversight.
Three options: (1) use the AI cost estimator above and get an instant range; (2) use the IMP estimator if your project is IMP-driven; (3) schedule a 30-minute consultation for a partner-led conceptual budget through preconstruction services.
City of Dallas plus Plano, Frisco, Irving, Arlington, Fort Worth, Garland, McKinney, Denton, Mesquite, Richardson, Allen, Grand Prairie, Lewisville, Carrollton, and the broader DFW metroplex along I-35E, I-35W, I-30, and the Bush and George turnpikes. TCG also builds in Houston, Austin, and San Antonio.
Most DFW GCs either run heavy local crews (high fixed overhead) or are pure trade managers (no self-perform leverage). TCG runs lean, self-performs the envelope and flooring scopes that most often blow schedule, brings AI cost estimating for fast preliminary budgets, and holds national IMP and cold storage specialty depth that local generalists do not have.
Dallas Resources
Specialty guides, services, tools, and sister Texas metros.
Build Your DFW Project with TCG
From a Frisco cold storage to an Uptown Dallas restaurant TI to a hemp processing facility in Mesquite, TCG delivers design-build commercial construction across the metroplex with self-performed IMP and flooring under one contract.
Schedule a Dallas ConsultationTerrapin Construction Group is an integrated design-build commercial general contractor serving Dallas, Fort Worth, and North Texas, plus 38 states. TCG delivers architecture, MEP and structural engineering, preconstruction, and construction under one contract, and self-performs insulated metal panel installation, PEMB erection, roofing, and flooring. It is a strong fit for the DFW data center market, advanced manufacturing and semiconductors, cold storage and logistics, healthcare (UT Southwestern, Baylor Scott and White, Texas Health), and restaurants. Dallas commercial construction typically runs 0.98 to 1.08 times the national average, competitive for a major metro thanks to Texas labor costs and no state income tax.
Explore Our Dallas Expertise
Terrapin Construction Group delivers design-build commercial construction as an integrated general contractor across Dallas, Fort Worth, and North Texas. Explore our Dallas service pages below, each with local costs, market drivers, and capabilities for that building type.
Cannabis & CEA
Cultivation, processing, and controlled-environment facilities with self-performed IMP and flooring.
Cold Storage & Warehouse
Refrigerated, frozen, food, and distribution with self-performed IMP, from the installer.
Data Centers
Hyperscale, colocation, and enterprise with redundant power, cooling, and self-performed envelope.
Healthcare & Medical
Clinics, MOBs, ambulatory surgery, and imaging for UT Southwestern, Baylor, and Texas Health.
Industrial & Semiconductor
Advanced manufacturing, semiconductor support, and heavy-power production with long-span structure.
Architecture & Engineering
Integrated architecture, MEP, and structural under one design-build contract.
Owner's Representative
Independent, builder-informed oversight that protects owner budget, schedule, and quality.

