Raleigh Architecture & Engineering
TCG provides in-house architectural design, structural engineering, and MEP engineering licensed in all 50 states. Single-source design-build for the Triangle, with no handoff gaps between design and construction.
Integrated Architecture & Engineering in the Triangle
Most contractors hand design to an outside firm and inherit the coordination gaps. TCG runs architecture, structural engineering, and MEP engineering in-house, all licensed in NC, so design intent and constructability are reconciled before drawings are finished.
That integration is the core of design-build. Paired with preconstruction and value engineering, it delivers NC-code-compliant design that is priced and buildable, and it compresses the overall schedule by 15 to 30 percent versus design-bid-build.
What Our A&E Team Delivers
Architectural Design
Full architectural design from programming through construction documents, NC code-compliant.
Structural Engineering
Foundations and structure designed for Piedmont soils and Triangle wind loads.
MEP Engineering
Mechanical, electrical, and plumbing design coordinated with the build team.
Preconstruction & VE
Budgeting, value engineering, and constructability reviews from concept.
Permitting & NC Code
Design to NC State Building Code and coordination with Wake County and city offices.
Design-Build Integration
One team and one contract across design and construction, with no handoff gaps.
Architecture & Engineering Fees in the Triangle
A and E fees are typically a percentage of construction value, not a price per square foot. Design-build bundles these into one contract. Ranges below are typical of commercial work.
Architecture
Of construction value, by complexity
MEP Engineering
Mechanical, electrical, plumbing design
Structural
Foundations and structural design
Total A/E + Soft Costs
Bundled in design-build delivery
Integrated Design-Build Delivery
Architecture, structural, and MEP under one contract, reconciling design intent and constructability before drawings finish and cutting schedule by 15 to 30 percent. See how design-build works.
Design and Build With One Team
In-house architecture and engineering, licensed in NC, delivered as design-build. Building in Charlotte as well? See our Charlotte architecture and engineering.
Schedule a Raleigh ConsultationArchitecture & Engineering FAQ
What is design-build?
How are architecture and engineering fees structured?
Is your design team licensed in North Carolina?
Why is in-house A and E better than outsourcing?
Do you design for Piedmont soils?
Can you bid from our existing plans?
Raleigh Construction Services
Life Sciences & BiotechData CentersHealthcare & MedicalCold StorageArchitecture & Engineering  Restaurant & QSRExplore TCG
Raleigh GC OverviewCharlotte GCCharlotte Architecture & EngineeringDenver HQHoustonDesign-BuildIMP InstallationIMP EstimatorAI EstimatorPermit TimelineLoan QualifierBid ReviewA&E Fees & Soft CostsHow to Read a GC BidTerrapin Construction Group · (720) 593-0169 · Schedule a call · info@terrapincg.com

