Albany Architecture & Engineering
TCG provides in-house architectural design, structural engineering, and MEP engineering licensed in all 50 states. Single-source design-build for the Capital Region, designed for New York code and climate.
Integrated Architecture & Engineering in New York
Most contractors hand design to an outside firm and inherit the coordination gaps. TCG runs architecture, structural engineering, and MEP engineering in-house, so design intent and constructability are reconciled before drawings are finished, with New York's energy code, snow loads, and SEQRA review designed in from the start.
That integration is the core of design-build. Paired with preconstruction and value engineering, it delivers code-compliant design that is priced and buildable, and compresses the overall schedule by 15 to 30 percent versus design-bid-build.
What Our A&E Team Delivers
Architectural Design
Programming through construction documents for New York code.
Structural Engineering
Snow and wind loads and foundations for Northeast conditions.
MEP Engineering
Mechanical, electrical, and plumbing tuned to the energy code.
Preconstruction & VE
Budgeting, value engineering, and constructability from concept.
Permitting & SEQRA
Design for local permitting and SEQRA environmental review.
Design-Build Integration
One team and one contract across design and construction.
Architecture & Engineering Fees in New York
Architecture and engineering fees are typically a percentage of construction value, not a price per square foot. Design-build bundles these into one contract. Ranges below are typical of commercial work.
Architecture
Of construction value, by complexity
MEP Engineering
Mechanical, electrical, plumbing design
Structural
Foundations and structural design
Total A/E + Soft Costs
Bundled in design-build delivery
Integrated Design-Build Delivery
Architecture, structural, and MEP under one contract, reconciling design intent and constructability before drawings finish and cutting schedule by 15 to 30 percent. See how design-build works.
Design and Build With One Team
In-house architecture and engineering, licensed in New York, delivered as design-build.
Schedule an Albany ConsultationArchitecture & Engineering FAQ
What is design-build?
How are architecture and engineering fees structured?
Is your design team licensed in New York?
Why is in-house A and E better than outsourcing?
Do you handle SEQRA and New York code?
Can you bid from our existing plans?
Albany Construction Services
Cannabis FacilitiesCold StorageHealthcare & MedicalRestaurant & QSRAutomotive DealershipsIndustrial & ManufacturingData CentersOwner's RepresentativeArchitecture & EngineeringExplore & Tools
Design-BuildIMP InstallationAI EstimatorIMP EstimatorPermit TimelineLoan QualifierBid ReviewA&E Fees & Soft CostsHow to Read a GC BidTerrapin Construction Group · (720) 593-0169 · Schedule a call · info@terrapincg.com