TCG provides in-house architectural design, structural engineering, and MEP engineering licensed in all 50 states. Single-source design-build for Oklahoma, designed for tornado wind and expansive soils.

Architecture & Engineering

Integrated Architecture & Engineering in Oklahoma

Most contractors hand design to an outside firm and inherit the coordination gaps. TCG runs architecture, structural engineering, and MEP engineering in-house, so design intent and constructability are reconciled before drawings are finished, with Oklahoma wind loads, storm shelters, and expansive soils designed in from the start.

That integration is the core of design-build. Paired with preconstruction and value engineering, it delivers code-compliant design that is priced and buildable, and compresses the overall schedule by 15 to 30 percent versus design-bid-build.

Scope

What Our A&E Team Delivers

Architectural Design

Programming through construction documents for Oklahoma code.

Structural Engineering

ASCE 7 wind design and drilled pier foundations for expansive clay.

MEP Engineering

Mechanical, electrical, and plumbing for demanding environments.

Preconstruction & VE

Budgeting, value engineering, and constructability from concept.

Permitting & Storm Shelters

Design for OKC permitting and ICC 500 storm shelters.

Design-Build Integration

One team and one contract across design and construction.

Cost Guide

Architecture & Engineering Fees in Oklahoma

Architecture and engineering fees are typically a percentage of construction value, not a price per square foot. Design-build bundles these into one contract. Ranges below are typical of commercial work.

Architecture

4 - 8%

Of construction value, by complexity

MEP Engineering

2 - 5%

Mechanical, electrical, plumbing design

Structural

1 - 3%

Foundations and structural design

Total A/E + Soft Costs

8 - 15%

Bundled in design-build delivery

Design-Build

Integrated Design-Build Delivery

Architecture, structural, and MEP under one contract, reconciling design intent and constructability before drawings finish and cutting schedule by 15 to 30 percent. See how design-build works.

Design and Build With One Team

In-house architecture and engineering, licensed in Oklahoma, delivered as design-build.

Schedule an OKC Consultation
FAQ

Architecture & Engineering FAQ

What is design-build?
Design-build combines architecture, engineering, and construction under a single contract. Overlapping design and construction delivers projects 15 to 30 percent faster with fewer change orders.
How are architecture and engineering fees structured?
Architecture and engineering fees are usually a percentage of construction value, commonly 8 to 15 percent combined for commercial work. In design-build, those services are bundled into one contract. See our guide to A and E fees and soft costs.
Is your design team licensed in Oklahoma?
Yes. TCG provides architecture and engineering licensed in all 50 states, including Oklahoma, and we design to Oklahoma code and ASCE 7 wind requirements.
Why is in-house A and E better than outsourcing?
In-house architecture, structural, and MEP reconcile design intent with constructability and budget before drawings finish, which removes the coordination gaps that cause change orders.
Do you design for tornadoes and expansive soils?
Yes. Our structural engineers design ASCE 7 wind resistance and ICC 500 storm shelters, and drilled pier foundations for central Oklahoma's expansive clays.
Can you bid from our existing plans?
Yes. We work from owner-provided drawings as a general contractor and also provide full in-house design when you need it.