Home/Oklahoma City GC/Commercial GC/Healthcare & Medical Office
Oklahoma City, Oklahoma

Oklahoma City Medical Office & Healthcare Construction

TCG builds medical offices, clinics, imaging suites, and urgent care across Oklahoma City and the state, designed and built with in-house architecture and MEP engineering and coordinated with OSDH.

Healthcare & Medical Office

Healthcare Construction in Oklahoma City

Oklahoma City is a growing healthcare market anchored by OU Health, INTEGRIS, Mercy, SSM Health, and the OU Health Sciences Center, driving demand for medical office, outpatient, and imaging space.

TCG delivers these facilities under design-build with in-house architecture and MEP engineering, coordinating medical gas, imaging shielding, and specialized HVAC, designing in storm shelters for occupied healthcare, and managing Oklahoma State Department of Health approval.

Scope

What We Build for Healthcare

Medical Office Build-Out

Exam rooms, nurse stations, labs, and clinical support.

Imaging & Shielding

CT, MRI, and X-ray suites with lead and RF shielding.

Outpatient & Procedure

Ambulatory surgery, endoscopy, and procedure suites.

Medical Gas & Vacuum

Med gas, vacuum, and specialized plumbing with certification.

Urgent Care Fit-Out

Fast-track urgent care and walk-in clinic build-outs.

Specialty Healthcare

Dental, optometry, dialysis, and specialty environments.

Cost Guide

Oklahoma City Healthcare Construction Costs

Healthcare cost is driven by clinical program, imaging, and code requirements. OKC's low cost base helps. These ranges are budgetary and verified by a TCG estimator.

Medical / Healthcare

$170 - $420 /SF

Clinical fit-out and MEP

Specialty / Imaging

$300 - $420 /SF

Imaging, surgery, shielding

Veterinary Clinic

$170 - $330 /SF

Animal hospital and clinic

Medical Office TI

$120 - $280 /SF

Second-generation build-out

Oklahoma Track Record

Medical Offices Built in Oklahoma

TCG has delivered medical office building work in Oklahoma with in-house MEP and clinical fit-out, the same delivery model we bring to every OKC healthcare project.

Build Healthcare Space in Oklahoma

From medical offices to imaging suites, TCG delivers healthcare projects as an integrated design-build general contractor.

Schedule an OKC Consultation
Recent TCG Project · Completed Fall 2026

Advantage Eye Care, Owensboro, KY

TCG delivered a 5,500 SF design-build tenant improvement for a full optometry practice in Owensboro, Kentucky, taking the space from shell to patient-ready under one contract, with architectural design, MEP coordination, and construction handled by one team.

5,500 SFOptometry practice
1 ContractDesign + construction
Shellto patient-ready
Advantage Eye Care optical showroom and patient lounge in Owensboro, Kentucky, built by Terrapin Construction Group
Showroom and lounge
Optical dispensary with frame displays and fitting stations at Advantage Eye Care
Optical dispensary
Custom quartz-top casework refreshment station at Advantage Eye Care
Custom casework

Clinical tenant improvements live or die on coordination: exam lanes built to sight-line and lighting-control requirements, a pre-testing suite, an optical dispensary with fitting stations, and a minor procedure room, all finished to a retail-grade patient experience with custom millwork throughout.

TCG brings the same single-source design-build team to medical office, clinic, and healthcare tenant improvement projects in Oklahoma City.

  • Delivery: design-build tenant improvement
  • Clinical: exam lanes, pre-testing suite, minor procedure room
  • Retail: optical dispensary and patient lounge
  • Finish: custom millwork and casework throughout

See all recent work on the TCG projects page.

FAQ

Healthcare Construction FAQ

What recent medical construction has TCG completed?
TCG recently completed Advantage Eye Care in Owensboro, Kentucky, a 5,500 SF design-build tenant improvement for a full optometry practice with exam lanes, a pre-testing suite, an optical dispensary, a minor procedure room, and custom millwork, delivered from shell to patient-ready under one contract. TCG brings the same design-build team to medical and healthcare projects in Oklahoma City.
How much does a medical office cost in Oklahoma City?
OKC healthcare runs roughly $170 to $420/SF for clinical fit-out and $300 to $420/SF for specialty and imaging space, with medical TI from about $120/SF. Try our AI estimator.
Has TCG built medical offices in Oklahoma?
Yes. TCG has delivered medical office building work in Oklahoma with in-house MEP and clinical fit-out.
Can you build imaging and medical gas systems?
Yes. We build CT, MRI, and X-ray suites with lead and RF shielding and structural support, and we install and certify medical gas and vacuum systems.
Does Oklahoma require special approval for healthcare?
Yes. Healthcare facilities require Oklahoma State Department of Health approval, and occupied healthcare buildings often require storm shelters, both of which we manage.
Why design-build for healthcare?
Clinical equipment, shielding, and code review create heavy coordination. Design-build puts architecture, MEP, and construction under one contract and shortens schedule.
Do you build urgent care clinics?
Yes. We deliver urgent care and walk-in clinic build-outs and conversions on fast-track schedules across Oklahoma.