TCG provides in-house architectural design, structural engineering, and MEP engineering licensed in all 50 states. Single-source design-build for Central Florida, with no handoff gaps between design and construction.

Architecture & Engineering

Integrated Architecture & Engineering in Central Florida

Most contractors hand design to an outside firm and inherit the coordination gaps. TCG runs architecture, structural engineering, and MEP engineering in-house, so design intent and constructability are reconciled before drawings are finished, and Florida Building Code wind and humidity are designed in from the start.

That integration is the core of design-build. Paired with preconstruction and value engineering, it delivers code-compliant design that is priced and buildable, and compresses the overall schedule by 15 to 30 percent versus design-bid-build.

Scope

What Our A&E Team Delivers

Architectural Design

Programming through construction documents, Florida Building Code compliant.

Structural Engineering

Foundations for sandy soils and high water tables, designed for FBC wind.

MEP Engineering

Mechanical, electrical, and plumbing, sized for Florida heat and humidity.

Preconstruction & VE

Budgeting, value engineering, and constructability from concept.

Permitting & FBC

Design to the Florida Building Code and coordination with Orange County.

Design-Build Integration

One team and one contract across design and construction.

Cost Guide

Architecture & Engineering Fees in Central Florida

Architecture and engineering fees are typically a percentage of construction value, not a price per square foot. Design-build bundles these into one contract. Ranges below are typical of commercial work.

Architecture

4 - 8%

Of construction value, by complexity

MEP Engineering

2 - 5%

Mechanical, electrical, plumbing design

Structural

1 - 3%

Foundations and structural design

Total A/E + Soft Costs

8 - 15%

Bundled in design-build delivery

Design-Build

Integrated Design-Build Delivery

Architecture, structural, and MEP under one contract, reconciling design intent and constructability before drawings finish and cutting schedule by 15 to 30 percent. See how design-build works.

Design and Build With One Team

In-house architecture and engineering, licensed in Florida, delivered as design-build.

Schedule an Orlando Consultation
FAQ

Architecture & Engineering FAQ

What is design-build?
Design-build combines architecture, engineering, and construction under a single contract. Overlapping design and construction delivers projects 15 to 30 percent faster with fewer change orders.
How are architecture and engineering fees structured?
Architecture and engineering fees are usually a percentage of construction value, commonly 8 to 15 percent combined for commercial work. In design-build, those services are bundled into one contract. See our guide to A and E fees and soft costs.
Is your design team licensed in Florida?
Yes. TCG provides architecture and engineering licensed in all 50 states, including Florida, and we design to the Florida Building Code.
Why is in-house A and E better than outsourcing?
In-house architecture, structural, and MEP reconcile design intent with constructability and budget before drawings finish, which removes the coordination gaps that cause change orders.
Do you design for Florida soils and wind?
Yes. Our structural engineers design foundations for sandy soils and high water tables and to Florida Building Code wind requirements for Central Florida.
Can you bid from our existing plans?
Yes. We work from owner-provided drawings as a general contractor and also provide full in-house design when you need it.