Orlando Cannabis Cultivation & Processing Construction

TCG builds cannabis cultivation, extraction, and processing facilities across Orlando and Central Florida, with self-performed insulated metal panel envelopes and polyaspartic flooring under one design-build contract.

Cannabis Cultivation & Processing

Cannabis Construction in Central Florida

Florida's medical cannabis program runs on vertically integrated operators that cultivate, process, and dispense under one license. That makes cultivation and extraction facilities the backbone of the market, and they are among the most systems-intensive buildings TCG delivers.

TCG self-performs the insulated metal panel envelope and polyaspartic flooring that grow and processing environments depend on, and delivers the full facility under design-build with in-house MEP engineering for dehumidification, power, and controlled-environment systems.

Scope

What We Build for Cannabis

Cultivation & Grow Rooms

Flower, veg, and mother rooms with sealed, washable envelopes.

Extraction & Processing

C1D1 and C1D2 rated rooms, labs, and post-processing space.

Environmental Control

Dehumidification, HVAC, and CO2 sized for grow load.

IMP Envelope

Self-performed insulated metal panel walls and ceilings.

Polyaspartic Flooring

Seamless, cleanable, chemical-resistant resinous floors.

Security & Compliance

Access control, CCTV, and state seed-to-sale compliance.

Cost Guide

Orlando Cannabis Construction Costs

Cannabis carries the widest cost range of any vertical, driven by lighting, dehumidification, racking, and compliance. These ranges are budgetary and verified by a TCG estimator.

Indoor Cultivation

$150 - $350 /SF

Grow rooms, HVAC, dehumidification

Extraction / Processing

$200 - $500 /SF

C1D1, labs, post-processing

Greenhouse / Hybrid

$50 - $150 /SF

Light-dep and hybrid structures

Dispensary / Retail

$150 - $350 /SF

Retail build-out and security

Orlando Track Record

Two Orlando Cannabis Facilities Delivered

TCG has delivered two cannabis cultivation and extraction facilities in Orlando, bringing self-performed IMP envelope and polyaspartic flooring together under one design-build contract.

Build Your Florida Cannabis Facility

Cultivation, extraction, and processing delivered as an integrated design-build general contractor.

Schedule an Orlando Consultation
Recent TCG Project · IMP Supply & Install

Indoor Cannabis Cultivation Facility, Minneapolis, MN

TCG supplied and installed 50,000 SF of insulated metal panel, with doors and hardware, to build out the cultivation rooms of an indoor cannabis facility in Minneapolis, then supplied and installed urethane cement flooring. One contractor, one schedule, envelope to floor.

50K SFInsulated metal panel
Doors& hardware included
UrethaneCement flooring
Terrapin Construction Group crew installing insulated metal panel cultivation room walls inside an indoor cannabis cultivation facility in Minneapolis, Minnesota
IMP cultivation rooms
Insulated metal panel walls and ceiling going up inside a Minneapolis indoor cannabis cultivation facility, with IMP crates staged on the slab
Panel walls and ceiling

Cultivation rooms hold tight temperature and humidity setpoints around the clock. A sealed, thermally continuous IMP envelope with an integrated vapor barrier keeps moisture out of the assembly, and urethane cement floors stand up to washdown, nutrients, and constant traffic.

TCG self-performs the same IMP envelope and specialty flooring scopes on cannabis cultivation and processing facilities in Orlando.

  • Envelope: 50,000 SF of IMP wall and ceiling panel forming the cultivation rooms
  • Openings: IMP doors and hardware supplied and installed
  • Flooring: urethane cement supplied and installed
  • Delivery: turnkey supply and install, self-performed

Full photo gallery on the project spotlight.

FAQ

Cannabis Construction FAQ

What recent cannabis facility work has TCG completed?
TCG recently supplied and installed 50,000 SF of insulated metal panel, with doors and hardware, plus urethane cement flooring for an indoor cannabis cultivation facility in Minneapolis, Minnesota. TCG self-performs the same IMP envelope and specialty flooring scopes on cannabis facilities in Orlando.
Has TCG built cannabis facilities in Orlando?
Yes. TCG has delivered two cannabis cultivation and extraction facilities in Orlando, with self-performed IMP envelope and polyaspartic flooring under design-build.
How much does a cannabis facility cost in Orlando?
Cannabis carries the widest range of any vertical: roughly $150 to $350/SF for indoor cultivation and $200 to $500/SF for extraction and processing, driven by lighting, dehumidification, and compliance. Try our AI estimator.
Does TCG self-perform IMP and flooring for grow rooms?
Yes. Self-performed insulated metal panel envelopes and polyaspartic flooring are core TCG scopes and are exactly what sealed, washable grow and processing environments require.
How do you handle grow-room HVAC and dehumidification?
Our in-house MEP engineers size dehumidification, HVAC, and CO2 to the grow load and integrate them with the controlled-environment envelope and controls.
Can you build extraction and C1D1 spaces?
Yes. We build C1D1 and C1D2 rated extraction and processing rooms with the ventilation, gas detection, and electrical classification those occupancies require.
Why design-build for a cannabis facility?
Envelope, environmental control, power, and compliance are tightly coupled, and speed to license revenue matters. Design-build puts it all under one contract and shortens schedule.