Updated July 2026
Cost Benchmarks / Restaurant & Hospitality
Restaurant Build Out Cost Per Square Foot
What it costs to build a restaurant in 2026, priced by city, by concept, by delivery method, and per seat. Covers tenant improvement build out and ground-up construction, the component breakdown behind the number, and where restaurant budgets actually break.
Terrapin Construction Group · Licensed in all 50 states
Cost by concept and cost per seat added. Component breakdown rebuilt with reconciled percentages. Build out data expanded to match search demand. TCG restaurant projects added. Benchmarks re-based to Q3 2026.
Quick Answer
What a Restaurant Costs to Build
In 2026, a restaurant build out in an existing space runs $125 to $650+ per square foot depending on shell condition, and ground-up construction runs $350 to $750 per square foot in hard costs. Both exclude land, soft costs, and FF&E.
Geography moves the number more than concept does. The same restaurant costs $425 to $700 per SF to build out in Manhattan and $200 to $375 in Texas. Add 15 to 25 percent for soft costs on top of either.
Kitchen systems and MEP together are 45 to 55 percent of hard cost on a full-service restaurant. That single fact explains why restaurant per-square-foot numbers look nothing like retail or office numbers, and why a second-generation restaurant space with reusable kitchen infrastructure is worth paying a rent premium for.
Build Out Cost by Shell Condition
Most restaurants are built into existing space, and what the landlord hands you decides most of the budget. National benchmarks, hard costs, July 2026.
| Shell Condition | Cost / SF | What You Inherit |
|---|---|---|
| Second-generation | $125–$250 | Former restaurant with reusable kitchen infrastructure, hood, grease interceptor, and gas service. The cheapest path by a wide margin. |
| Warm shell | $175–$325 | MEP roughed in and HVAC distributed. Operator installs kitchen and finishes. |
| Cold shell | $250–$450 | Open space with utilities stubbed. Full MEP, kitchen, and finish build out by tenant. |
| Full flagship build out | $350–$650+ | Complete custom environment, new kitchen, premium millwork and finishes. |
The gap between second-generation and cold shell is roughly $125 per square foot. On a 4,000 SF restaurant that is $500,000, which is usually worth more than any rent concession you will negotiate. Inspect the existing hood, grease interceptor, gas service size, and electrical panel before you compare rents. See tenant improvement cost by space type.
Build Out Cost by City
Full cold-shell to finished restaurant build out, inclusive of MEP, kitchen, and finishes, exclusive of FF&E and soft costs.
| Market | Build Out / SF | What Drives It |
|---|---|---|
| New York CityManhattan, Brooklyn, Queens | $425–$700+ | Union labor, high-rise logistics, freight elevator scheduling, DOB filing and expediters |
| Pacific CoastSF, LA, Seattle, Portland | $375–$650 | California energy and seismic codes, extended permitting, accessibility triggers |
| NortheastBoston, DC, Philadelphia | $325–$575 | Union labor, historic buildings, code complexity in older stock |
| Mountain WestDenver, Phoenix, Salt Lake | $275–$475 | Trade scarcity against rapid market growth |
| SoutheastMiami, Nashville, Atlanta | $250–$450 | Code escalation, coastal and wind-load requirements in Miami |
| MidwestChicago, Minneapolis | $250–$425 | Union jurisdiction in Chicago, seasonal logistics |
| TexasAustin, Dallas, Houston | $200–$375 | Competitive open-shop labor market, lowest regulatory burden of the major metros |
| Broader South and GulfSan Antonio, Tampa, Charlotte | $175–$325 | Lowest labor costs nationally |
Building in a specific market? Austin · Houston · Chicago · Denver · Atlanta · Nashville · Tampa
Before the Lease
Price the Space Before You Sign It
Send us the space, the shell condition, and your concept. We will come back with a real build out number while you still have negotiating leverage. Free, and we will tell you if the deal does not work.
Cost by Restaurant Concept
Concept changes the kitchen, and the kitchen changes the budget. These ranges sit inside the national $350 to $750 ground-up band, and the same relative spread applies to build out.
| Concept | Ground-Up / SF | The Cost Driver |
|---|---|---|
| Bar-forward and cocktail lounge | $350–$575 | Lighter kitchen load, heavier bar millwork, AV, and lighting. Glycol lines and draft systems. |
| Upscale casual | $375–$550 | Standard Type I hood package, moderate finish level, higher seat turnover design. |
| Sushi and raw bar | $400–$650 | Specialized refrigeration and fish handling, minimal hood, high-end millwork at the counter. |
| Fine dining and flagship | $450–$750+ | Custom millwork, acoustic treatment, layered lighting design, private dining, expanded BOH. |
| Wood-fired and live-fire Italian | $475–$725 | Hearth or pizza oven, heavy exhaust and make-up air, structural support, fire separation. |
| Steakhouse | $500–$800 | Highest kitchen load. Broiler exhaust, dry-aging rooms, expanded refrigeration, wine display. |
Apply the city multiplier on top. A steakhouse in Manhattan and a steakhouse in San Antonio are the same concept and roughly a 2.5x difference in construction cost.
What You Are Actually Paying For
Component breakdown for a full restaurant build in a mid-tier market such as Denver, Atlanta, or Dallas. Dollar figures shown against the $350 and $750 per SF endpoints of the national range.
| Component | Share | At $350/SF | At $750/SF |
|---|---|---|---|
| Shell and structure | 32% | $112 | $240 |
| MEP systemsHVAC, plumbing, electrical | 27% | $95 | $203 |
| Commercial kitchen systems | 22% | $77 | $165 |
| Interior finishes and millwork | 15% | $53 | $113 |
| Site work and utilities | 4% | $14 | $30 |
| Total hard cost | 100% | $350 | $750 |
On kitchen-intensive concepts such as steakhouse and wood-fired, kitchen systems reach 30 percent and shell drops correspondingly. On bar-forward concepts the reverse happens and millwork climbs. Kitchen and MEP together run 45 to 55 percent of hard cost across every full-service format, which is the number worth remembering.
Soft costs add another 15 to 25 percent on top: architecture, engineering, permitting, inspections, and owner's representative fees. See A&E fees and soft costs. FF&E is separate again, and furniture, smallwares, and decorative fixtures procured directly by the operator rather than through the GC typically save 15 to 25 percent.
Cost Per Seat
Operators underwrite per seat more often than per square foot, because seats generate revenue and square feet do not.
| Format | SF Per Seat | Cost Per Seat |
|---|---|---|
| Fast casual | 18–25 | $6,300–$12,000 |
| Upscale casual | 25–32 | $9,400–$17,600 |
| Fine dining | 30–40 | $13,500–$30,000 |
Square feet per seat includes back of house, not just dining area. Cost per seat equals SF per seat multiplied by cost per square foot, using $350 to $750 depending on format. A 150-seat fine dining restaurant at 35 SF per seat is roughly 5,250 SF, and at $500 per SF that is about $17,500 per seat in hard cost. Run your own seat count and market rate rather than taking a national figure into an investor meeting.
Ground-Up Construction by Market
Hard costs for ground-up restaurant construction, excluding land, soft costs, and FF&E.
| Market | Ground-Up / SF |
|---|---|
| New York City Manhattan, Brooklyn | $650–$950 |
| San Francisco and Bay Area | $650–$950 |
| Los Angeles West Hollywood, Beverly Hills, Downtown | $575–$875 |
| Boston Back Bay, Seaport, Cambridge | $575–$800 |
| Seattle | $525–$775 |
| Washington DC Downtown, Georgetown, NoMa | $525–$750 |
| Chicago River North, West Loop, Fulton Market | $500–$725 |
| Miami and Miami Beach | $475–$700 |
| Portland | $450–$650 |
| Denver and Boulder LoDo, RiNo, Cherry Creek | $425–$625 |
| Nashville | $425–$625 |
| San Diego and Sacramento | $425–$625 |
| Austin Domain, South Congress, East Austin | $400–$600 |
| Philadelphia and Hartford | $400–$575 |
| Minneapolis and St. Paul | $400–$575 |
| Phoenix and Scottsdale | $375–$550 |
| Salt Lake City | $375–$525 |
| Atlanta | $375–$550 |
| Dallas Uptown, Design District, Deep Ellum | $375–$550 |
| Houston Montrose, River Oaks, Midtown | $350–$525 |
| Charlotte and Raleigh | $350–$525 |
| Boise and Tucson | $325–$475 |
| Columbus and Indianapolis | $325–$475 |
| Tampa and Orlando | $325–$475 |
| Kansas City and St. Louis | $300–$450 |
| San Antonio and Fort Worth | $300–$450 |
| Detroit, Cleveland, Milwaukee | $275–$400 |
Two notes. A flagship fine dining restaurant in Manhattan, all-in including soft costs and FF&E, can exceed $1,500 per square foot. And California's regulatory environment adds an estimated 12 to 18 percent premium over equivalent projects in other Western states, mostly through energy code, seismic detailing, and extended review.
Build Out or Ground-Up?
Build out wins on cost and speed in almost every case. Ground-up wins when you need a freestanding pad with a drive-thru, when no suitable second-generation space exists in the trade area, or when the brand prototype cannot be delivered inside an existing envelope.
The decision usually gets made on schedule rather than cost. Ground-up runs 12 to 18 months from permit issuance to opening. A build out runs 5 to 9 months of construction, plus 4 to 12 weeks of permitting depending on jurisdiction. On a space carrying $30,000 a month in rent, six months of difference is $180,000 that never appears in a construction budget. See permitting timelines by state.
Delivery method matters more than most operators expect. Design-build compresses schedule by 10 to 15 percent against design-bid-build by overlapping design and procurement, and it puts cost feedback into the design process while the drawings can still change. See cost-plus versus GMP and design-build services.
Fogo de Chão, Phoenix, AZ
TCG provided construction management for a full-service Fogo de Chão Brazilian steakhouse in Phoenix, Arizona, coordinating the open churrasco grill line, bar, dining room, and commercial kitchen through opening.





High-end restaurant work is schedule and detail driven: hoods, make-up air, gas, grease systems, and finish quality all have to land on the same opening date. TCG ran the trades, the schedule, and owner reporting to a national fine-dining brand standard.
Why it matters for your budget: the ranges in this guide climb fastest on exactly the scopes this project carried: a show kitchen, a full bar, and a dining room built to a national brand standard. Construction management keeps those trades on one schedule and one opening date. See TCG’s restaurant construction and construction management services.
- Kitchen: open churrasco grill line with Type I hood and make-up air per NFPA 96
- Front of house: full bar and main dining room
- Back of house: commercial kitchen and support spaces
- Exterior: facade and entry to brand standard
See all recent work on the TCG projects page.
Restaurant Projects TCG Has Delivered
Denver, CO
PF Chang's
The Woodlands, TX
Del Frisco's Grille
The Woodlands, TX
Perry's Steakhouse
Texas · 2 locations
3 Forks Steakhouse
Texas · 3 locations
El Pollo Campero
Austin, TX
Hotel ZaZa
Design-build and construction management delivery across fine dining, steakhouse, upscale casual, and QSR formats. See the full project portfolio or hotel, restaurant and QSR construction.
Five Mistakes That Blow Restaurant Budgets
- Signing the lease before pricing the space. Shell condition, existing hood and grease infrastructure, gas service size, and electrical capacity are all knowable before execution. After execution you have no leverage and no exit.
- Treating the hood package as a line item rather than a system. Type I hood, make-up air, fire suppression, and the structural support to carry them are one decision. Pricing them separately is how restaurants find $80,000 in the field.
- Undersizing electrical and gas service. Existing 200A or 400A service rarely carries a full-service kitchen. The upgrade runs $35,000 to $180,000 and can add months if the utility is involved. See commercial electrical cost.
- Ignoring grease interceptor requirements. Required on nearly every food service use, frequently absent in second-generation space, and the permit alone adds 4 to 10 weeks. Installation runs $15,000 to $80,000.
- Value-engineering after design is complete. Cutting a finished design backward costs weeks and design fees on top of the savings. Bringing a contractor in during design typically recovers 6 to 12 percent without touching the guest experience. See preconstruction services.
How TCG Approaches Restaurant Work
We price restaurants before lease execution, when the number still changes a decision. That includes shell assessment, kitchen infrastructure review, code trigger analysis, and a real allowance position rather than a per-square-foot guess. Terrapin Construction Group delivers restaurant construction nationwide, licensed in all 50 states, with offices in Denver, Houston, Albany, and Sheridan. Already have a bid in hand? Use the free third-party bid review before you sign it.
Nationwide, All 50 States
Build It Right the First Time
Concept, square footage, market, and target opening date. That is all we need to put a real number and a real schedule in front of you.
Restaurant Construction Cost FAQ
How much does a restaurant build out cost per square foot?
How much does it cost to build a restaurant from the ground up?
How much does a restaurant build out cost in NYC?
What is the most expensive part of building a restaurant?
How much does a restaurant cost to build per seat?
Which restaurant concept costs the most to build?
How long does it take to build a restaurant?
What is a reasonable TI allowance for a restaurant tenant?
Is it cheaper to take over an existing restaurant space?
Should I use a local or national general contractor for restaurant construction?
Sources. RSMeans / Gordian; CBRE construction cost and retail research; JLL; NAIOP; AGC of America Construction Inflation Alert; National Restaurant Association; and Terrapin Construction Group project data across restaurant and hospitality work in 38 states. Benchmarks reflect July 2026 conditions. Next scheduled review: October 2026.
Related. QSR construction cost · Coffee shop buildout · Fast casual cost · Tenant improvement by space type · Hotel cost per key · Commercial HVAC cost · How to read a GC bid · Hotel, restaurant and QSR construction · Preconstruction services