Fort Collins Cold Storage Construction

TCG is the design-build general contractor for refrigerated, frozen, and food-processing facilities across Fort Collins and Northern Colorado, with self-performed IMP installation, the thermal envelope at the core of every cold build.

Fort Collins Cold Storage

Cold Storage and Refrigerated Construction in Northern Colorado

Cold storage and food processing demand is climbing along the I-25 corridor as Northern Colorado's food, beverage, and distribution sectors grow. TCG builds refrigerated, frozen, and blast-freeze facilities, with the insulated envelope, vapor control, and floor systems that make or break a cold building.

The difference is that we self-perform IMP installation, over 1,000,000 SF across 38 states. The panel envelope is the single most important cold-storage scope, and controlling it in-house protects thermal performance, schedule, and cost. Read our cold storage IMP guide. TCG is headquartered in Denver.

Scope

What We Build for Cold Storage

❄️

Refrigerated Coolers

Above-freezing storage and processing for food, beverage, and distribution.

🧊

Freezer Facilities

Frozen storage with high-R envelopes, vapor control, and under-slab heating.

🌬️

Blast Freeze

High-capacity blast freezing for food processing and cold-chain operations.

⚡

IMP Envelope

Self-performed insulated metal panel install engineered for thermal performance. Price it with the IMP estimator.

🍴

Food Processing

USDA and food-grade facilities with washdown finishes and controlled environments.

🔄

Cold Storage Conversions

Adding refrigerated or frozen space to existing warehouse and industrial shells.

Project Spotlight: Northern Colorado Cold Storage

TCG has delivered cold storage in Northern Colorado with a self-performed IMP envelope, refrigerated and frozen space engineered for thermal performance in the Front Range climate.

Because we install the panels ourselves, the most critical cold-storage scope stays under our control from design through commissioning. Get envelope pricing from the IMP estimator or a full budget from the AI estimator.

Fort Collins Costs

How Much Does Cold Storage Cost in Fort Collins?

Fort Collins cold storage runs at roughly a 1.10 to 1.20x national multiplier, and temperature class drives the number: coolers cost less than freezers, and blast freeze costs the most. See our cold storage cost guide and facility-type cost guide.

Refrigerated Cooler$140 to $240/SF
Freezer$200 to $330/SF
Blast Freezer$280 to $420/SF
Food Processing$180 to $440/SF
Cold Storage TI$90 to $260/SF

Building Cold Storage in Northern Colorado?

Price the envelope with the IMP estimator and the full project with the AI estimator. Then let's talk temperature class and schedule.

FAQ

Cold Storage Construction FAQ

How much does cold storage cost in Fort Collins?▼

Coolers run about $140 to $240/SF, freezers $200 to $330/SF, and blast freeze $280 to $420/SF. Use the AI estimator for your facility.

Does TCG self-perform the IMP envelope?▼

Yes. We have installed over 1,000,000 SF of insulated metal panels across 38 states. The envelope is the most important cold-storage scope, and we keep it in-house. Price it with the IMP estimator.

Can you build freezers and blast freeze?▼

Yes. We build coolers, freezers, and blast-freeze facilities with high-R envelopes, vapor barriers, and under-slab heating to prevent frost heave.

Do you build food processing facilities?▼

Yes. We build USDA and food-grade processing facilities with washdown finishes and controlled environments, often paired with refrigerated storage.

Can you add cold storage to an existing building?▼

Yes. We convert and retrofit existing warehouse and industrial shells into refrigerated or frozen space. See adaptive reuse.

How long does a cold storage build take?▼

Typically 6 to 12 months depending on size and temperature class. Long-lead refrigeration equipment and the panel package are the main schedule drivers.