Author & Partner
William C. Goodin
Partner and Vice President, Project Development, Terrapin Construction Group
- PMP
- LEED AP
- ICC National Standard General Building Contractor (Class B)
- OSHA 30
Will leads early-phase project strategy at TCG, taking owners from concept and budget through design and contract. He writes most of TCG's cost guides, drawing on live estimates, subcontractor bids and more than 25 years of design-build delivery.
TCG is a licensed general contractor in all 50 states, with licensed architecture and MEP, structural and civil engineering stamped in all 50 states.
Background
Will is one of three partners at Terrapin Construction Group, a Denver-based commercial general contractor and design-build firm. He oversees client engagement, preconstruction, estimating and design-phase management so every project starts aligned on cost, schedule and performance.
Before TCG, Will served as Vice President of the Project Management Office at Urban-Gro, Inc. (NASDAQ: UGRO). He also founded several firms, including REI Capital, BWI Capital, Rubix Group, FlexMOD and GroAdvisor, and has completed hundreds of design-build projects across the United States and abroad.
He holds a B.S. in Construction Management and Business Administration from Colorado State University.
Areas of Focus
- Design-build delivery and preconstruction for $1M to $30M projects
- Cold storage and insulated metal panel envelopes
- Cannabis cultivation and controlled environment agriculture
- Data center shells, retrofits and long-lead procurement
- Commercial construction cost benchmarking
Selected Project Experience
A sample of work Will has led or supported with TCG and its partners. References are available on request.
Data Center Campus, North Dallas, TX
Three 100,000 SF pre-engineered metal buildings, including sitework and concrete, delivered ahead of schedule and under budget.
Vireo Health, Elk River, MN
Full design-build with self-performed insulated metal panel installation.
PepsiCo, Blue Ridge, VA
Bottling and storage facility work for a repeat national client.
Indoor Cultivation, Minneapolis, MN
IMP supply and install with doors and hardware, plus urethane cement flooring.
Fogo de Chão
Full remote construction management, including the Phoenix, AZ location.
Advantage Eye Care, Owensboro, KY
Ground-up design-build medical office, completed in 2026.
Cost Guides by Will
Benchmarks built from TCG estimates and real subcontractor pricing, refreshed quarterly.
- Commercial Construction Cost Per Square Foot by Building Type (2026)
- Average Cost to Build a Cold Storage Facility in the USA
- Insulated Metal Panel Installation Cost (2026)
- Manufacturing Facility Construction Cost (2026)
- Average Cost to Build a Data Center in the USA
- Pre-Engineered Metal Building Cost Per Square Foot
- All articles and market analysis →
In the News
Recent coverage of TCG's work.
Talk Through Your Project With Will
Bring a site, a budget or a set of drawings. You'll leave with a realistic cost range, a schedule and a clear next step.
Schedule a Call
