Jacksonville Restaurant and QSR Construction
TCG builds restaurants that open on schedule. As a self-performing design-build general contractor, we deliver full-service restaurants, quick-service and drive-thru, and hotel food and beverage across Jacksonville and the Beaches, from kitchen MEP and hood systems to the dining room finishes.
Jacksonville Restaurant Cost Estimator
Describe your restaurant, QSR, or hospitality project and get a preliminary, Jacksonville-calibrated cost range from a design-build general contractor that has opened kitchens across the Southeast.
Tell Us About Your Restaurant Project
Square footage, seat count, kitchen and hood scope, drive-thru, and whether this is ground-up, a pad, or a second-generation tenant improvement all sharpen the estimate.
Analyzing Your Jacksonville Project
Evaluating construction costs using Northeast Florida market data...
Your Jacksonville Construction Cost Estimate
Restaurants That Open On Schedule
Restaurant construction is won or lost on the kitchen and the calendar. A missed opening date burns rent, payroll, and momentum before the first cover is served. TCG delivers restaurants as design-build, so the kitchen layout, the MEP loads, and the health department path are coordinated from day one rather than discovered in the field.
For Jacksonville projects we build full-service restaurants, fast-casual and QSR, drive-thru pads, bars, and hotel food and beverage. We coordinate the commercial kitchen and Type I hood, grease interception, heavy plumbing and electrical, HVAC and make-up air, and the dining and bar finishes that set the guest experience. Work is delivered design-build or as a general contractor from your architect's set.
Background reading: fast-casual restaurant cost, high-end restaurant cost per SF, cost to build a QSR, and commercial HVAC cost.
What Goes Into a Jacksonville Restaurant Build
Commercial Kitchen and Hoods
Kitchen layout, Type I and Type II hoods, make-up air, fire suppression, and equipment set coordinated with the menu and workflow.
Grease and Plumbing
Grease interceptors sized to code, floor drains and sinks, and heavy hot-water and gas service for a working kitchen.
Dining, Bar, and FF and E
Dining room and bar buildout, millwork, seating, and fixtures, furniture, and equipment that carry the brand and guest experience.
MEP and HVAC
Heavy electrical for kitchen equipment, HVAC and make-up air balanced for comfort and code, and controls via in-house MEP.
Finishes and Envelope
Durable, cleanable finishes, storefront and patio, and FBC wind-rated envelope for ground-up and pad builds.
Health Dept and Permitting
Florida DBPR and county health plan review, City of Jacksonville permitting, and grease and hood approvals coordinated up front.
Jacksonville Restaurant Costs
Restaurant cost is driven by kitchen scope, format, and whether you are building ground-up or reworking an existing space. Typical Jacksonville ranges:
Fast-Casual / QSR
Compact kitchen, counter service
Full-Service
Larger kitchen, bar, dining finishes
Drive-Thru Pad
Ground-up pad, site work, canopy
2nd-Gen TI
Existing restaurant space reuse
Ranges are planning level for the Jacksonville metro and exclude land and most FF and E. Run your specific scope through the free TCG.ai estimator for a tighter number.
Restaurant Construction in Northeast Florida
Tourism and growth demand: Jacksonville, the Beaches, and St. Johns County are among the fastest growing hospitality markets in the Southeast. Population growth and tourism support new QSR, fast-casual, and full-service openings across the First Coast.
No state income tax: Florida's tax climate and lower cost base (about 0.88 to 0.96x the national average) help restaurant returns pencil, especially for multi-unit operators expanding into Jacksonville.
Grease, health, and code: Florida DBPR and county health review, grease interceptor sizing, and Type I hood and fire suppression are the details that hold up openings. We coordinate them before permit, not during inspection.
Wind and envelope: FBC wind design at 130 plus mph in coastal Duval County drives storefront, canopy, and envelope on ground-up and pad restaurants. We also build restaurants in Orlando and Tampa.
Restaurant and QSR Experience
Pad-Site Quick-Service Build
Ground-up drive-thru QSR on a pad with kitchen, canopy, and site work delivered to an aggressive opening date.
Chef-Driven Restaurant
Full commercial kitchen, bar, and dining buildout with heavy MEP and custom finishes for a full-service concept.
Second-Generation Conversion
Existing restaurant space reworked with new kitchen equipment, hood, and finishes for a new operator.
Fogo de Chão, Phoenix, AZ
TCG provided construction management for a full-service Fogo de Chão Brazilian steakhouse in Phoenix, Arizona, coordinating the open churrasco grill line, bar, dining room, and commercial kitchen through opening.





High-end restaurant work is schedule and detail driven: hoods, make-up air, gas, grease systems, and finish quality all have to land on the same opening date. TCG ran the trades, the schedule, and owner reporting to a national fine-dining brand standard.
TCG brings the same construction management and restaurant team to full-service, fast-casual, and QSR projects in Jacksonville.
- Kitchen: open churrasco grill line with Type I hood and make-up air per NFPA 96
- Front of house: full bar and main dining room
- Back of house: commercial kitchen and support spaces
- Exterior: facade and entry to brand standard
See all recent work on the TCG projects page.
Jacksonville Restaurant FAQ
What recent restaurant work has TCG completed?
How much does it cost to build a restaurant in Jacksonville?
How fast can TCG open a restaurant?
Do you handle the commercial kitchen and hood systems?
Can you build a drive-thru QSR on a pad site?
Do you do second-generation restaurant tenant improvements?
What permits does a Jacksonville restaurant need?
Restaurant Resources
Build a Restaurant in Jacksonville
Talk to a design-build general contractor that opens kitchens on schedule. We will scope your restaurant or QSR project, from kitchen and hood to the dining room, and give you a verified number.
Schedule a Restaurant ConsultationExplore More Jacksonville Construction Services
Terrapin Construction Group delivers integrated design-build construction across every sector in Northeast Florida. Explore our other Jacksonville service pages, each with local costs, Florida Building Code guidance, and a market-calibrated estimator.
Jacksonville Cannabis Construction
Licensed cultivation and processing facilities with self-performed insulated metal panel envelopes and Cannafloors flooring across Northeast Florida.
View → 🧊Jacksonville Cold Storage Construction
Refrigerated, frozen, and distribution facilities with self-performed IMP, built for JAXPORT and the I-95 and I-10 logistics corridors.
View → 🖥️Jacksonville Data Center Construction
Enterprise, edge, and colocation facilities with redundant power, cooling, and self-performed envelope for Northeast Florida's digital infrastructure.
View → 🏥Jacksonville Medical Office Construction
Clinics, medical office buildings, imaging, and ambulatory surgery for Baptist Health, Mayo Clinic, UF Health, and Ascension St. Vincent's.
View → 🏭Jacksonville Industrial & Manufacturing
Advanced manufacturing, logistics, and heavy-power production with long-span structure, near JAXPORT and the I-95 and I-10 corridors.
View → 📦Jacksonville Self-Storage Construction
Single-story, multi-story, and climate-controlled self-storage on pre-engineered metal buildings and IMP, built for Jacksonville's fast-growing suburbs.
View → 📐Jacksonville Architecture & Engineering
Integrated architecture, MEP, and structural engineering under one design-build contract, built to Florida Building Code wind requirements.
View → 🛡️Jacksonville Owner's Representative
Independent, builder-informed oversight that protects owner budget, schedule, and quality on Jacksonville projects.
View →
