Home › Columbus GC › Medical Office Construction Columbus
Healthcare · Columbus, Ohio

Columbus Medical Office Construction & Healthcare Design-Build

TCG builds medical office buildings, urgent care clinics, surgery centers, dental and optometry offices, and veterinary hospitals across the Columbus metro, one of the Midwest's deepest healthcare markets, with design-build delivery and in-house healthcare MEP engineering.

$190-$470
Per SF Range
10-20
Months Typical MOB
Top 20
US Healthcare Metro
38
States Served
Last Updated: July 2026
TCG.ai

Columbus Medical Construction Cost Estimator

Describe your medical office, clinic, or healthcare project and get a preliminary estimate calibrated to Columbus market pricing and clinical program.

1Describe Project
2AI Analysis
3Cost Estimate

Tell Us About Your Columbus Medical Project

Include facility type (MOB, urgent care, surgery center, dental, optometry, veterinary), square footage, exam/operatory/OR counts, imaging scope, and ground-up vs tenant improvement.

0 characters
📍 Location 🏥 Facility Type 📐 Size 💉 Clinical Program ☢️ Imaging 🔄 New vs TI 📅 Schedule
Contact Information * required

Analyzing Your Columbus Project

Our AI is evaluating construction costs using Columbus metro market data…

Parsing project parameters
Classifying building type & systems
Applying Columbus regional indices
Calculating system-by-system costs
Preparing your estimate
0%

Your Columbus Construction Cost Estimate

Request Formal Proposal
This estimate is preliminary and based on Columbus metro market data. All pricing will be verified by a TCG estimator before any formal proposal is issued.
Columbus Healthcare

Medical Construction in a Top-20 Healthcare Metro

Terrapin Construction Group builds medical facilities across the Columbus metro, serving Columbus, OH. Central Ohio is one of the Midwest's deepest healthcare markets: The Ohio State University Wexner Medical Center, Nationwide Children's Hospital, OhioHealth, and Mount Carmel are all in sustained outpatient expansion, pushing ambulatory surgery centers, urgent care, imaging, and multi-specialty clinics into suburban nodes from Dublin and Westerville to Grove City and Pickerington. Our hospital construction boom analysis covers the national wave behind this.


Medical construction is a discipline of systems, not finishes. Medical gas, air change rates, HEPA filtration, lead shielding, essential power, and plumbing density drive both cost and licensure, and mistakes discovered at inspection are catastrophically expensive. TCG's in-house MEP engineers design clinical systems to FGI Guidelines, our architects at 3rd Act plan clinical adjacencies with the provider's workflow, and our field teams run ICRA containment protocols when working in or beside occupied care environments. Ohio ASC licensure through the Ohio Department of Health is a path we manage end to end.


TCG's active Kentucky work includes the Advantage Eye Care optometry TI in Owensboro, and our healthcare practice spans medical office buildings, urgent care and walk-in clinics, and veterinary clinics and animal hospitals nationwide. For physician-owners financing their first building, start with the construction loan qualifier and the SBA 504 guide.

Capabilities

Columbus Medical Construction Capabilities

Every outpatient format, from single-provider TIs to ground-up ambulatory campuses.

Medical Office Buildings

Ground-up and core-and-shell MOBs with clinical-grade MEP, $190-$340/SF. See the MOB cost guide.

Urgent Care & Walk-In Clinics

X-ray suites, lead shielding, and rapid-turn buildouts, $240-$440/SF. See urgent care services.

Ambulatory Surgery Centers

OR-grade HVAC, medical gas, essential power, and Ohio Department of Health licensure support, $350-$600/SF.

Dental & Optometry Offices

Operatory plumbing, nitrous piping, exam lane electrical, and retail-facing finishes. See dental costs and optometry costs.

Veterinary Clinics & Animal Hospitals

Surgery suites, kennels, and acoustic separation, $190-$470/SF. See veterinary construction.

Medical Tenant Improvements

Clinical conversions of office and retail space with ICRA protocols, $180-$470/SF. See TI services.

Cost Guide

What Medical Construction Costs in Columbus (2026)

Columbus medical pricing at the metro's 0.90-1.02x multiplier: MOB ground-up $190-$340/SF, specialty/surgical $290-$470/SF, medical TI $180-$470/SF, urgent care $240-$440/SF, ASC $350-$600/SF. Clinical MEP intensity is the swing factor: an imaging suite with lead shielding or an OR with essential power can double the cost of the square footage it occupies.


Plan further with the master Commercial Construction Costs Guide, the cost per SF by building type reference, the A&E fees and soft costs guide, the permitting timeline guide, and the finance & owner advisory guide.

Recent TCG Project · Completed Fall 2026

Advantage Eye Care, Owensboro, KY

TCG delivered a 5,500 SF design-build tenant improvement for a full optometry practice in Owensboro, Kentucky, taking the space from shell to patient-ready under one contract, with architectural design, MEP coordination, and construction handled by one team.

5,500 SFOptometry practice
1 ContractDesign + construction
Shellto patient-ready
Advantage Eye Care optical showroom and patient lounge in Owensboro, Kentucky, built by Terrapin Construction Group
Showroom and lounge
Optical dispensary with frame displays and fitting stations at Advantage Eye Care
Optical dispensary
Custom quartz-top casework refreshment station at Advantage Eye Care
Custom casework

Clinical tenant improvements live or die on coordination: exam lanes built to sight-line and lighting-control requirements, a pre-testing suite, an optical dispensary with fitting stations, and a minor procedure room, all finished to a retail-grade patient experience with custom millwork throughout.

TCG brings the same single-source design-build team to medical office, clinic, and healthcare tenant improvement projects in Columbus.

  • Delivery: design-build tenant improvement
  • Clinical: exam lanes, pre-testing suite, minor procedure room
  • Retail: optical dispensary and patient lounge
  • Finish: custom millwork and casework throughout

See all recent work on the TCG projects page.

FAQ

Columbus Medical Construction FAQ

Common questions about building medical, dental, and veterinary facilities in the Columbus metro. Visit our full FAQ page for 70+ questions, or see the Columbus commercial general contractor page for market-wide answers.

TCG recently completed Advantage Eye Care in Owensboro, Kentucky, a 5,500 SF design-build tenant improvement for a full optometry practice with exam lanes, a pre-testing suite, an optical dispensary, a minor procedure room, and custom millwork, delivered from shell to patient-ready under one contract. TCG brings the same design-build team to medical and healthcare projects in Columbus.

Ground-up medical office buildings run $190-$340/SF, specialty and surgery-capable space $290-$470/SF, and medical tenant improvements $180-$470/SF depending on clinical intensity. See our medical office building cost guide and use the AI estimator above for a Columbus-specific range.

Urgent care centers run $240-$440/SF in the Columbus market, with X-ray suites, lead shielding, and after-hours HVAC zoning as the main premiums over standard medical office. Our urgent care cost guide breaks down TI vs ground-up by region, and our urgent care construction page covers the full scope.

Columbus is anchored by The Ohio State University Wexner Medical Center, Nationwide Children's Hospital (one of America's largest pediatric systems), OhioHealth, and Mount Carmel Health System. All four are pushing outpatient care into suburban ambulatory sites in Dublin, Westerville, New Albany, Grove City, and Pickerington, which is exactly the MOB and clinic product TCG builds.

The Facility Guidelines Institute publishes the design standards most states and health systems reference for clinical space: room sizes, air changes, medical gas, and infection control. Ohio references FGI for licensed facilities, and hospital-affiliated leases typically require compliance regardless. Learn more at fgiguidelines.org; TCG's in-house architects plan to FGI from day one.

Yes. ASCs in Ohio are licensed by the Ohio Department of Health and must meet construction, life safety, and essential power requirements beyond standard medical office, including generator-backed systems and enhanced HVAC filtration. TCG designs and builds ASC-ready space and manages the inspection path to licensure.

Yes. Dental offices run $200-$420/SF, optometry $180-$380/SF, and veterinary clinics $190-$470/SF in the Columbus market. See our dental office cost guide, optometry cost guide, and veterinary clinic cost guide, plus our dedicated veterinary construction page.

Healthcare projects in occupied buildings require ICRA (Infection Control Risk Assessment) protocols: negative-air containment, sealed corridors, and HEPA filtration during construction. TCG self-performs commercial flooring including seamless, cleanable clinical systems, and our crews are experienced working adjacent to active patient care.

Let's Build Your Columbus Medical Facility

From suburban MOBs to surgery centers and veterinary hospitals, TCG delivers healthcare construction with clinical MEP expertise and design-build accountability.

Schedule a Healthcare Consultation